Renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility.

SCOPE OF WORK: Prospective bidder shall examine carefully the site of the work and be satisfied as to all observable conditions. Bidder shall be responsible for measuring and calculating amount of work. Bid price is to include the removal and proper disposal of all work-related debris. The project consists of, and is not limited to, furnishing all materials, labor, services, supervision, tools, equipment, including all associated permits, and all other items necessary for the successful completion of the project in accordance with the plans and specifications included with the bid documents, which shall include the electrical upgrades and replacement of two critical switchgears, stepdown transformers, and associated panels and electrical equipment. The purpose of this project is to replace "critical switchboard 208V" located in UPS room 158, 500kVA Transformers, Panels "RPR1", "RPR2" and "EMCC1" located in room 160 at the Data Processing and Communications Center. The project design sequence objective is to drastically reduce and/or eliminate electrical outages. The abbreviated scope entails the following: - Full scope is as per approved permit drawings. - Disconnect Panel DMC and energize from fusible disconnect switch. - Demolish EMCC1 and Panel DMC Main and replace with new switchboard MDP-ME and well pump starters. - De-energize Panel DMC and disconnect from 400A fusible disconnect. - Connect Panel DMC to new switchboard MDP-ME. - Installation and preparation of new Critical SWBD-208V. Includes temporary feeds and coordinated installation. - Demolish, replace and energize Panel RDP2. Removal of existing conductors from conduits. Conduits to be reused. Includes new feeder installation. - Lower existing drop ceiling 12". - Demolish, replace and energize Panel RDP1 with new feeders from new Critical Switchboard-208V. - Transfer loads from existing panels to new in a planned and controlled manner to avoid shutdowns. - Reassign Panel RDP1 as new splice point. - Install factory supplied pulling section for new Critical Switchboard-208V to cover all necessary underground conduits. License Requirement: Electrical Contractor The project dry-run submittal has been approved by Miami-Dade County Building Department. The process number with MDC is C2024170780. The contractor shall be responsible for verifying and obtaining all required permits for the project. Bid Documents consist of the RPQ information from CIIS, Attachment 5A (Bid Form), forms, Standard Construction General Contract Conditions, ISD Special Provisions, as well as approved plans/technical specifications. All bidders shall become thoroughly familiar with all terms of this RPQ prior to the Pre-Bid meeting. Failure to do so will in no way relieve the Awarded Bidder from completing the required work for the bid price. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. If you have any questions, contact Phillip Salisbury at (305)898-2898 (Contractor must obtain and submit all permits prior to performing any work). Prospective bidder shall examine carefully the site of the work and be satisfied as to all observable conditions. Bidder shall be responsible for measuring and calculating amount of work. Bid price is to include the removal and proper disposal of all work-related debris. The project consists of, and is not limited to, furnishing all materials, labor, services, supervision, tools, equipment, including all associated permits, and all other items necessary for the successful completion of the project in accordance with the plans and specifications included with the bid documents, which shall include the electrical upgrades and replacement of two critical switchgears, stepdown transformers, and associated panels and electrical equipment. Question Deadline 01/21/2025 at 2:00 PM ET All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3-27 and shall be emailed to marcela.rodriguez@miamidade.gov with a copy to phillip.salisbury@miamidade.gov and clerkbcc@miamidade.gov. The deadline to receive RFIs from bidders is no Responses cannot be guaranteed for RFIs submitted past the established deadline. Procedural questions may be entertained by phone or during the Pre-Bid Meeting.

Sub-Bidding

Municipal

$672,154.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
48
Bidding Soon
984
All Active Projects
403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 9, 2025

img_map_placeholder

5680 SW 87th Ave, Miami, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.