BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work, paving and new construction of a mixed-use development in Livermore, California. Working plans call for the construction of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

Zone 7 Water Agency (hereinafter referred to as "Zone 7") is seeking Proposals from qualified Consultants to provide professional services for design and engineering services during construction for the Mocho Wells PFAS Treatment Facility Project and the Wells and MGDP Electrical Modernization Project, with expertise and experiences as described in the Scope of Work. The goal is to have the PFAS treatment facility complete and operational by September 2028 for compliance with the 2024 PFAS National Primary Drinking Water Regulation (89 CFR 32532). The goal for the electrical modernization project is to be complete and operational by September 2027. Both projects are combined into this Request for Proposal and shall be submitted as one package by Consultants. DESCRIPTION OF ZONE 7 A. Zone 7 Water Agency Zone 7 is one of ten active zones of the Alameda County Flood Control and Water Conservation District, and is a special district established by State legislature in 1949. Zone 7 Water Agency was established by popular vote of the residents of the Livermore-Amador Valley in 1957 under an amendment to the District Act. Zone 7 provides drinking water to about 280,000 customers within a service area of approximately 425 square miles in eastern Alameda and Contra Costa Counties. Drinking water is supplied to four retailers: California Water Service Company, City of Livermore, City of Pleasanton and Dublin San Ramon Services District. Approximately 80 percent of Zone 7's drinking water supply is from the State Water Project (South Bay Aqueduct and Lake Del Valle) and locally conserved surface water, with the remainder supplied from local groundwater sources (the Livermore-Amador Groundwater Basin), which it is responsible for managing. Raw water from the South Bay Aqueduct is delivered to agricultural areas primarily located around the City of Livermore. As the major water supply agency in eastern Alameda County, Zone 7 has an ongoing commitment to planning for existing and future needs, implementing needed projects, maintaining a reliable water delivery system, and providing a quality product and service to the community. While Zone 7 production wells typically would provide 20 percent of drinking water supply, during droughts or emergencies, wells can become the primary supply for meeting Zone 7 water demands. With the Mocho wells representing a large portion of the Zone 7 total well capacity, PFAS treatment is needed for the reliability of these wells. Questions or comments regarding this RFP shall be submitted through via email to msibal@zone7water.com no later than 3:00 p.m. on January 3, 2025.

Final Planning

Water / Sewer

$32,660,000.00

Public - County

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
12
Bidding Soon
1,735
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

Project location map

Multiple Locations, Livermore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.