BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work for a water / sewer project in Linn Valley, Kansas. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: BULK FILL STATION LS BOOSTER PUMP STATION LS SYSTEM INTEGRATION LS WATERLINES, BORED AND/OR IN PLACE, SIZES 2" THRU 12" 149,146 LNFT GATE VALVE W/BOX, SIZES 4" THRU 12" 371 EACH 1" HDPE SERVICE LINE, BORED AND/OR IN PLACE 22,675 LNFT 5-1/4" FIRE HYDRANT ASSEMBLY 98 EACH 5/8" WATER METER W/RESIDENTIAL SERVICE ASSEMBLY 506 EACH REMOVE AND REPLACE EXISTING METER 123 EACH REMOVE AND REPLACE SURFACING, GRAVEL 9,893 SQYD REMOVE AND REPLACE SURFACING, ASPHALT 987 SQYD REMOVE AND REPLACE SURFACING, CONCRETE 166 SQYD ADD ALTERNATES 1-6 FOR ADDITIONAL WATERLINE AND WATER METER ASSEMBLIES THROUGHOUT LINN VALLEY A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Bid security must be at least 5% of the Bidder's maximum Bid price. Pre-bid Site Visit and Testing by Bidders: The Contractor is encouraged to review the instructions provided in Article 5 of the Instructions to Bidders as it pertains to site exploration and testing. The City may approve, as indicated in Article 5. Bidders to access the Project site and conduct such investigations, explorations and tests as Bidder deems necessary for preparing and submitting a Bid. Article 5.04.B. of the Instructions to Bidders provides Owner contact information for which the prospective Bidder must contact to schedule a pre-bid site visit. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Jason Hoskinson, P.E. Project Manager jason.hoskinson@bgcons.com. The Owner reserves the right to reject any and all bids and to waive any irregularities therein. Question Deadline 01/10/2025

Award

Water / Sewer

$14,873,645.00

Public - City

Site Work

381

20

84

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
64
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

March 17, 2025

Project location map

Multiple Locations, Linn Valley, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.