Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 17, 2025 at 7:00 PM
Updated January 18, 2025
Site work and paving for a road / highway in Buckeye, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Proposed Work Consists of Full Depth Milling of the Existing Asphalt Pavement and Replacing With Five Inches New Asphalt Pavement (1.5 Inches Pmtr of 1/2 Inch Superpave for Low Traffic on 3.5 Inches of 3/4 Inch Superpave for High Traffic) on Existing Aggregate Base. Re-grading Existing Aggregate Base, Proof Rolling, Installation of Pavement Markings, Dispose of Millings at Two Stockpile Locations and Other Miscellaneous Work is Included in This Project. The Project Length is Approximately 2.0 Miles. All Construction Work on This Contract is to Be Completed Within 90 Calendar Days Beginning With the Date Specified in the Notice to Proceed. Exclusive of and Following the Contract Time Allowed for Construction Work Are 120 Calendar Days for Internal Administrative Purposes Thereby Resulting in a Total Contract Performance Period of 210 Calendar Days. No Pre-bid Conference Has Been Scheduled Under This Procurement. Bid security percent:10% Question Deadline 01/07/2025 at 5:00 PM MT
Post-Bid
Roads / Highways
$400,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
February 17, 2025
Sun Valley Pkwy, Buckeye, AZ
Related To This Project
Buckeye, AZ
Bid Date: Jan 21 2025
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: May 04 2021
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Mar 11 2025
Buckeye, AZ
Bid Date: Jan 06 2025
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Jan 06 2025
Buckeye, AZ
Bid Date: Dec 17 2024
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Dec 17 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
