Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in New Hope, Minnesota. Completed plans call for site work for a water / sewer project.
South Water Tower Repaint for the furnishing of all labor, materials, and all else necessary for the following: South Water Tower Repaint - City Project No. 1101 In general, Work consists of the following: An existing 1,500,000 gallon fluted column style elevated reservoir. Provide surfaced preparation, coatings, miscellaneous structural repairs, containment, and all associated work. Direct inquiries to Engineer's Project Manager, Tim Grinstead, at (651) 775-5635 and Tim.Grinstead@Stantec.com. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. For this project, the City will only accept online electronic bids through online The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor Once the tank is drained, the work shall be completed within 13 weeks. The project must be started between April 1, 2025 and April 15, 2025 and completed within the 13 week period. 4.02 Dates for Start Construction, Substantial Completion, and Final Payment A. The Work on this project will be Substantially Completed on or before July 18, 2025 and completed and ready for Final Payment in accordance with Paragraph 14.07 of the General Conditions on or before August 15, 2025.
Sub-Bidding
Water / Sewer
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
19
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2025
April 1, 2025
To Be Determined, New Hope, MN
Related To This Project
New Hope, MN
Bid Date: Feb 07 2019
New Hope, MN
Bid Date: Mar 05 2019
New Hope, MN
Bid Date: Mar 14 2019
New Hope, MN
Bid Date: Apr 15 2021
New Hope, MN
--
New Hope, MN
--
New Hope, MN
Bid Date: May 16 2024
New Hope, MN
Bid Date: May 16 2024
New Hope, MN
Bid Date: Mar 14 2024
New Hope, MN
Bid Date: Feb 11 2021
New Hope, MN
Bid Date: Jan 23 2024
New Hope, MN
Bid Date: Jan 18 2024
New Hope, MN
Bid Date: Dec 07 2023
New Hope, MN
Bid Date: Nov 16 2023
New Hope, MN
Bid Date: Jan 26 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.