EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Saint Marys, Pennsylvania. Completed plans call for the renovation of a educational facility.

South St. Marys Street Elementary School Fire Alarm Replacement, which consists of removing the existing fire alarm system. A Rid Guaranty in the form of Bond shall be submitted with the Proposal in an at percent (10%) of he Total Bid Amount QUESTIONS: Inquiries, requests for information and requests for clarifications should he directed in writing to the Architect at cmaines@ktharch.com - No questions will receive a response if they are submitted later than seven (7) days prior to the bid date. THE OWNER RESERVES THE RIGHT to postpone or cancel receipt of bids, and to accept or to reject any and all bids, in whole or in part if the best interest of the Owner will be served thereby.

Award

Educational

$384,500.00

Public - City

Renovation

10

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
46
Bidding Soon
641
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

June 2, 2025

img_map_placeholder

370 S St Marys St, Saint Marys, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South St. Marys Street Elementary School Fire Alarm Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.