Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 14, 2025 at 8:00 PM
Updated April 15, 2025
Demolition, site work, paving and new construction of a civil project in Saint Marys, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Reconstruction of deficient ADA curb ramps, replace safe dispersal surfaces, adjust stair treads, provide cane rail protection, provide handrail extensions, lower fire extinguisher cabinets, and revise platform signage. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE : 7% The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in ELK COUNTY, CITY OF ST MARYS, Commonwealth of Pennsylvania, STATE ROUTE 0120, SECTION A08. The project is situated as follows:On State Route 0120 at Segment 0420/Offset 1190 to Segment 0420/Offset 2399. For a construction length of approximately 1009.24 feet (0.191 miles).For the removal of a structure and construction of its replacement, a Precast Reinforced Concrete Box Culvert. Construction includes Superpave Asphalt Mixture Designs for the base, binder, and wearing courses, guide rail upgrades, drainage improvements, pavement markings, and miscellaneous construction as indicated on the approved construction drawings. Structure Work: 33.00% Pre-Bid Meeting: None Anticipated NTP: 05/27/2025 Wage Rates: Yes Required Completion: 07/22/2026 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Bridge Over Big Run *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$1,657,310.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
May 27, 2025
PA-120, Saint Marys, PA
Related To This Project
Saint Marys, PA
Bid Date: Apr 22 2025
Saint Marys, PA
Bid Date: Jun 04 2025
Saint Marys, PA
Bid Date: Jun 04 2025
Saint Marys, PA
Bid Date: Aug 12 2025
Saint Marys, PA
Bid Date: Jul 28 2025
Saint Marys, PA
--
Saint Marys, PA
Bid Date: Oct 20 2025
Saint Marys, PA
Bid Date: Dec 17 2025
Saint Marys, PA
Bid Date: Mar 13 2025
Saint Marys, PA
Bid Date: Mar 14 2025
Saint Marys, PA
Bid Date: Mar 05 2025
Saint Marys, PA
--
Saint Marys, PA
--
Saint Marys, PA
Bid Date: Jan 08 2025
Saint Marys, PA
Bid Date: Aug 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
