EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 22, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Flint, Michigan. Completed plans call for the renovation of a educational facility.

Reference Number 0000371181 Bid Intent Not Available Delivery Point: Main Campus 1401 East Court Street Flint, Michigan United States 48503 Mott Community College (MCC) is seeking a qualified mechanical contractor to provide mechanical work which will include some ductwork, Variable Air Volume (VAV) boxes, piping hook up to VAV boxes as well as electrical to VAV boxes. Question Deadline 01/09/2025 at 5:00 PM ET Questions are submitted online Yes Project Schedule: Start Date: January 15, 2025. Contractor should have all materials, equipment, labor, etc. ready before beginning work to keep the duration of the construction to a minimum. Substantial Completion Date: March 1, 2025 Buyer Preferences, Guidelines & Requirements General Requirements - Certified Payroll - FOB Destination - Installation Required - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan - Warranty Information Required Award Requirements - All or None Award Bonding Requirements Intentionally omitted.

Award

Educational

$59,100.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
111
Bidding Soon
1,495
All Active Projects
659
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2025

January 15, 2025

img_map_placeholder

1509 E Court St, Flint, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FLC Mechanical System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.