BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

Renovation of an educational facility in Duffield, Virginia. Completed plans call for the renovation of a educational facility.

Project Scope of Work - Contractor shall make all efforts to maintain integrity of all exit doorways and other school property during demo. Contractor will be responsible for damages. - Scott County Schools Maintenance will remove all electrical controls and disconnect all electrical connections from coal fired boiler and associated equipment to allow completion of the project. - Scott County Schools will have all water connections removed and/or valved off to allow for all boiler and piping removal from the space by the contractor. - Contractor shall remove two coal fired boilers, coal hoppers, augers, coal storage bin, any remaining unused coal, any and all insulation with the boiler and piping system, water piping and valves, steam piping, condensate return system, two water storage tanks and support structure, flue piping to within 6-12" of the chimney wall, metal and all other associated parts from the boiler room and hauled offsite for proper disposal. - The exterior chimney and any lining material shall be removed to approximately 4' above the roof line. A temporary cover shall be installed on the chimney to keep out water, debris, or small rodents/animals. The mechanical contractor will provide a permanent cover upon completion of the new boiler flue pipe installation. During the chimney removal, 60mil rubber shall be placed on the roof up to 24' away from all four sides of the chimney with 3/4" plywood or other similar material of same structural quality, covering on top of the rubber up to 12' away from the chimney's outside edge on all four sides for protection of the new roof installed in 2019. The demolition contractor will be responsible for any damage to the roofing membrane. - Any water lines or steam lines remaining in the walls of the coal storage room, boiler room, or electrical room shall have a rubber end cap with hose clamp or other suitable pipe end cap installed to seal off the opening of the pipe. - Some water could be in the piping and boiler, contractor and employees shall use precaution as needed to drain the water for safe demolition of equipment - Contractor is responsible for all tools and equipment including all rigging required to complete the demolition work. - Contractor is responsible for removing all material that is a part of the boiler demolition from the space and school property.

Post-Bid

Educational

$370,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
59
Bidding Soon
932
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

February 26, 2025

Project location map

164 Eagles Nest Ln, Duffield, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.