Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2024 at 7:00 PM
Updated December 21, 2024
Site work for a development in Pinecrest, California. Working plans call for site work for a development.
UPDATE - 12/19/2024 - An error was discovered regarding the estimated price range magnitude for construction items. The estimated price range magnitude is between $250,000 and $500,000. Site Visit Q&A and attendees list has been added to the attachments. ***This notice is issued for informational purposes only to provide an opportunity for fall viewing of the project site prior to issuance of the Request for Proposals. Some of the DRAFT contract documents are being made available to contractors to get familiar with the requirements. These are not the FINAL contract requirements and information contained in these documents is subject to change. Final offer should not be developed nor submitted based on the draft information. The Request for Proposals is expected to be posted to SAM.gov around the end of January 2025. *** DESCRIPTION Background: The Bumblebee Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. Period of Performance: All work shall be completed by November 1, 2028. Description of Work: Mechanical cutting, skidding, and removal of sawtimber, biomass, and cull trees with included erosion control and slash treatment. Sawtimber removal on 1,458 acres, biomass removal on 451 of those acres, and cull tree removal 566 of those acres as well. Mastication on 771 acres total, most of which is within the timber removal units. There is 3.8 miles of dead hazard tree removal prior to reconstruction on 13.3 miles of National Forest system roads. Construction items are expected to have the estimated price magnitude between $100,000 and $250,000. If the total value of the construction items is greater than $150,000, payment and performance bonds are required and shall be provided within 10 days of award. Bonds shall be 100% of the total value of the road reconstruction items (see FAR 52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR 2020). A bid guarantee shall be required whenever performance and payment bonds are required (see FAR 52.228-1 Bid Guarantee (SEP 1996) (DEVIATION MAY 2020)). Construction (Davis Bacon) wage determination aplies to all Road Reconstruction work items. Estimated Timber Volume and Species composition is as follows: o Sawtimber = 17,460 ccf (10,033 mmbf) with 11% IC, 14% PP, 1% SP, and 74% WF. o Green biomass trees & sawtimber tops = 1,518 ccf o Cull snags = 1,955 ccf, (1,188 mbf) o Cull hazard trees = 45 ccf, (26 mbf) A field visit will be held by the Forest for prospective contractors to facilitate dialogue on contractual requirements that are anticipated in the contract and any operational limitations foreseen by attendees. The field visit will be held on Tuesday December 17th, 2024, at 9:30 a.m. with a meeting location at the Summit Ranger District, #1 Pinecrest Lake Rd, Pinecrest CA 95364. Send questions or interest to Jason Dierberg at jason.dierberg@usda.gov. Follow this notice on SAM for future notifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Conservation and Development
$500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
1 Pinecrest Lake Rd, Pinecrest, CA
Related To This Project
Pinecrest, CA
--
Pinecrest, CA
Bid Date: Sep 01 2023
Pinecrest, CA
Bid Date: Apr 25 2023
Loma Linda, CA
Bid Date: Feb 27 2025
Jurupa Valley, CA
--
Santa Barbara, CA
Bid Date: Jan 23 2025
San Martin, CA
--
Wildomar, CA
--
Morgan Hill, CA
--
Morgan Hill, CA
--
Irwindale, CA
--
Madera, CA
Bid Date: Feb 03 2025
Fremont, CA
Bid Date: Oct 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.