Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2025 at 7:00 PM
Updated January 28, 2025
Site work and new construction of a pre-engineered storage facility in Gold Bar, Washington. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
fire district station 53, for the for the construction of a 50 by 93 post frame building at 41907 SR 2, Gold Bar Washington. Standard Building to Include: G.1 26 gauge 16" painted skyline steel roof on 1/2 " cdx plywood underlayment and 30lb felt. G.2 29 gauge 36" painted steel sides and trim. G.3 All steel fastened with #10 self-sealing wood grip screws. G.4 2" Tri Dimensional Poly Backed Fiberglass - WMPVR-R Vapor Barrier Insulation in walls and gables. G.5 Structural plans, drawings engineering and permit service to complete the building. G.6 Continuous ridge ventilation with 3 - 18"x24" gable vents and bird block venting at 3 gables. G.7 6" K- Line gutter metal gutters with 6 - 3"x4" downspouts. G.8 2 - 3070, 1 - 6070 - 2 sides active, 2 - 4070 18 Gauge metal insulated doors with lever lockset with Panic Hardware. 1- 3070 20-minute fire door with lever lockset with Panic Hardware. G.9 3 - 12'2"x14'1" NWD model 354S insulated white in color 7sect/3 panel garage doors with 1/2 " clear 24"x12" tempered glass in top 4 sections and slide locks. G.10 2 -5'x4' and 4 - 4'x4' double glazed vinyl sliding windows, vented/ Low e, with 0.28 U-value. 2- 2-1/2' x 1-1/2' non-vented Low e, double glazed sliding windows with obscured glass. G.11 50'x16' 1/2 " CDX interior walls to the peak of the roof as written in the drawing. G.12 50' by 63' by 6" concrete slab with fiber mix reinforced and zip strip crack control with polished shop floor finish, with 6 mil black visqueen vapor barrier. G.13 18" eave and gable roof overhangs with 1/2 " pressure treated CDX sheeting. G.14 50'x30' "office section fully T-girted. G.15 Roof construction is to be a 4 /12 pitch. G.16 Roof rating 25LB snow load. G.15 85 M.P.H Wind, Exposure B - 110 VULT. Option 1. 50'x30' 4" concrete slab with 2' ridged foam insulation and a 6 mil visqueen vapor barrier. Bid Price
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$326,436.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2025
February 6, 2025
41907 US-2, Gold Bar, WA
Related To This Project
Gold Bar, WA
Bid Date: Feb 26 2025
Gold Bar, WA
Bid Date: Mar 19 2025
Gold Bar, WA
Bid Date: Feb 27 2025
Gold Bar, WA
Bid Date: Mar 06 2025
Gold Bar, WA
Bid Date: May 26 2025
Gold Bar, WA
Bid Date: May 22 2025
Gold Bar, WA
--
Gold Bar, WA
--
Gold Bar, WA
--
Gold Bar, WA
Bid Date: May 23 2024
Gold Bar, WA
Bid Date: May 16 2024
Gold Bar, WA
Bid Date: Jan 28 2022
Orting, WA
Bid Date: Jan 23 2025
Sunnyside, WA
Bid Date: Dec 31 2024
Montesano, WA
Bid Date: Jan 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
