BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2025 at 7:00 PM

Updated January 28, 2025

Site work and new construction of a pre-engineered storage facility in Gold Bar, Washington. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

fire district station 53, for the for the construction of a 50 by 93 post frame building at 41907 SR 2, Gold Bar Washington. Standard Building to Include: G.1 26 gauge 16" painted skyline steel roof on 1/2 " cdx plywood underlayment and 30lb felt. G.2 29 gauge 36" painted steel sides and trim. G.3 All steel fastened with #10 self-sealing wood grip screws. G.4 2" Tri Dimensional Poly Backed Fiberglass - WMPVR-R Vapor Barrier Insulation in walls and gables. G.5 Structural plans, drawings engineering and permit service to complete the building. G.6 Continuous ridge ventilation with 3 - 18"x24" gable vents and bird block venting at 3 gables. G.7 6" K- Line gutter metal gutters with 6 - 3"x4" downspouts. G.8 2 - 3070, 1 - 6070 - 2 sides active, 2 - 4070 18 Gauge metal insulated doors with lever lockset with Panic Hardware. 1- 3070 20-minute fire door with lever lockset with Panic Hardware. G.9 3 - 12'2"x14'1" NWD model 354S insulated white in color 7sect/3 panel garage doors with 1/2 " clear 24"x12" tempered glass in top 4 sections and slide locks. G.10 2 -5'x4' and 4 - 4'x4' double glazed vinyl sliding windows, vented/ Low e, with 0.28 U-value. 2- 2-1/2' x 1-1/2' non-vented Low e, double glazed sliding windows with obscured glass. G.11 50'x16' 1/2 " CDX interior walls to the peak of the roof as written in the drawing. G.12 50' by 63' by 6" concrete slab with fiber mix reinforced and zip strip crack control with polished shop floor finish, with 6 mil black visqueen vapor barrier. G.13 18" eave and gable roof overhangs with 1/2 " pressure treated CDX sheeting. G.14 50'x30' "office section fully T-girted. G.15 Roof construction is to be a 4 /12 pitch. G.16 Roof rating 25LB snow load. G.15 85 M.P.H Wind, Exposure B - 110 VULT. Option 1. 50'x30' 4" concrete slab with 2' ridged foam insulation and a 6 mil visqueen vapor barrier. Bid Price

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$326,436.00

Public - County

New Construction, Site Work

8

4

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
97
Bidding Soon
1,526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2025

February 6, 2025

Project location map

41907 US-2, Gold Bar, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.