BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work for a water / sewer project in Gold Bar, Washington. Completed plans call for site work for a water / sewer project.

Bids description : The email subject shall be "Bid Proposal for Orchard Ave Water Main Replacement Project." Bidders submitting will select "request delivery receipt" option when sending email and/or include request for receipt in writing within the email. soon as possible after notification. Bidders who are not one of the notified three lowest bidders do not need to provide a hard copy of the original bid. The work to be performed is as follows: The work, to be performed under these specifications consists of furnishing all Labor, tools, materials, and equipment necessary for construction of the Orchard Ave Water Allam Replacement Project. Generally, the project includes the construction of+-2,630 lineal feet of new 8-inch DI water main and +-250 lineal feet of new 6-inch DI water main with associated valves, fittings, fire hydrants, air and vacuum release valves, and water services. It also includes traffic control, trench repair, and associated project restoration as shown on the Contract Plans, these Contract Provisions, and the Standard Specifications. Results will be tabulated and recorded by City staff with the Mayor witnessing and will be posted and emailed to all bidders by 5:00 pin on Tuesday, March 11th. This online plan room provides Bidders with fully usable online documents with the ability to: download, view, print, order full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool. It is recommended that Bidders "Register" in order to receive automatic email notification of future addenda and to place themselves on the "Self-Registered Bidders List." Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. All bids shall be submitted on the prescribed Bid Forms and in the manner as stated in this advertisement and in the Project Manual and said bids shall be accompanied by a bid deposit in the form of a cashier's check, postal money order, or surety bond to the City of Gold Bar in the amount of five percent (5%) of the total amount of the bid. If a surety bond is used, said bond shall be issued by a surety authorized and registered to issue said bonds in the State of Washington. The bond shall specify the surety's name, address, contact and phone number, and shall include a power of attorney appointing the signatory of the bond as the person authorized to execute it. Should the successful bidder fail to enter into the Contract and furnish satisfactory performance bond within the time stated in the Information for Bidders, the bid deposit sha 11 be forfeited to the City of Gold Bar. Faxed bids and/or surety bonds will not be accepted Contractors/Subcontractors must comply with Executive Order 11246 as amended by Executive Order 11375 regarding affirmative action and equal opportunity. The City of Gold Bar is an Equal Opportunity Employer. This project is subject to State prevailing wage rates. The City shall award a contract based on the lowest acceptable bid of the bid schedule in the contract proposal. The City of Gold Bar reserves the right to accept the bid that is in the best interest of the City, to postpone the acceptance of bids and the award, of the Contract for a period not to exceed sixty (60) days, or to reject any and all bids received. Subject to the foregoing, the bid may be awarded to the lowest responsible bidder. When awarded the Contract, the successful bidder shall promptly execute the Contract and shall furnish a bond of faithful performance of the Contract in the full amount of the Contract price. The engineer's estimate for this project is' $830,000 - $870,000. The time of completion (performance period.) for this Project is 60 working days. Guarantees and maintenance bonds shall be in accordance with City of Gold Bar, State of Washington, Public Works Performance and Payment Bond forms and requirements. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$680,139.00

Public - City

Site Work

27

8

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
81
Bidding Soon
1,512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

Orchard Ave, Gold Bar, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.