Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Provo, Utah. Completed plans call for the renovation of a 234,000-square-foot transportation facility; and for site work for a sidewalk / parking lot.
The City of Provo, Utah is seeking to hire a qualified and motivated firm to provide Construction Manager AtRisk services for the design of an expansion to the existing Commercial Terminal building to be located at 1331 Sky Way, Provo, Utah 84601. Phase 1 of the Terminal Expansion is projected to be approximately 34,000 square feet. The expansion will contain an expansion to the ticketing and queuing areas for passengers, as well as an expanded area for outgoing baggage handling and distribution, including a reconfiguration and installation of new baggage conveyors. Phase 2 of the Terminal Expansion is projected to be approximately 200,000 square feet. The expansion includes additional secure hold room space for an additional six aircraft departure gates, expansion of the TSA passenger screening area, an international terminal, expansion and reconfiguration of the inbound baggage handling system, additional office space for tenants and TSA, reconfiguration of the terminal loop road, and the relocation of the rental car parking lot. Provo City reserves the right, at its sole discretion, to delay or postpone Phase 2 construction should sufficient funding not be secured. Provo City projects a total construction budget for phase 1 of approximately $16,000,000 million. The construction budget for phase 2 is approximately $82,000,000. The City of Provo will administer the design, funding, construction, maintenance, and operation of the facility. Portions of the Project are being funded by the Federal Aviation Administration (FAA) which will require adherence to federal funding guidelines as required by the FAA. The City anticipates using a Construction Manager At-Risk (CMAR) management approach for this Project and expects to select the CMAR prior to the Schematic Design Phase (30% Design
GC Bidding
Transportation Terminals
$98,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2025
September 23, 2025
1331 Sky Vw Lp, Provo, UT
Related To This Project
Provo, UT
Bid Date: Dec 17 2024
Provo, UT
Bid Date: Dec 19 2024
Provo, UT
Bid Date: Dec 18 2024
Provo, UT
Bid Date: Nov 26 2024
Provo, UT
Bid Date: Dec 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.