Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work and paving for a civil project in Ketchum, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
** As of today February 6,2025 this project has been awarded to Canyon Excavation with the amount of $568,469.24 * The proposed project consists of the construction of new water infrastructure to functionally replace existing water main in State Highway 75 Idaho Transportation Department right-of-way. New water infrastructure east of State Highway 75 is proposed beginning adjacent to the south of 702 S Main Street and ending in Farnlun Place. New water infrastructure west of State Highway 75 is proposed beginning at Serenade Lane and ending adjacent to the north of Glade Court. Work is to be constructed in conjunction with Idaho Transportation Department SH-75, Elkhorn Rd to River St, Ketchum project. Work includes. Demolition: includes sawcut and asphalt/ concrete or landscape removal necessary for the installation of Water Infrastructure. Water Infrastructure: includes but is not limited to water main line, associated appurtenances/fittings, fire hydrant connections, and reuse irrigation service installation. All trenching shall be backfilled for temporary vehicular access per Water Construction Drawings. Surface and Landscape Repair: includes but is not limited to the repair of surface and landscape improvements, i.e. asphalt, vegetation, irrigation, fencing, etc. The Contractor shall clean up the site after construction so that it is in a condition equal to or better than that which existed prior to construction. Traffic Control: includes preparation and implementation of traffic control plan and road closure schedule consistent with MUTCD standards. Farlun Place closures shall be coordinated with City of Ketchum for impacted neighbor notifications. Question Deadline 01/13/2025 All questions regarding the meaning or intent of the Bidding Documents are to be directed to the OWNER'S ENGINEER. Interpretations or clarifications considered necessary by the OWNER'S ENGINEER in response to such questions will be issued by addenda mailed or delivered to all parties recorded by the OWNER'S ENGINEER as having received the Bidding Documents
Award
Water / Sewer
$568,469.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2025
March 5, 2025
ID-75, Ketchum, ID
Related To This Project
Ketchum, ID
--
Ketchum, ID
Bid Date: Feb 14 2025
Ketchum, ID
Bid Date: Apr 04 2025
Ketchum, ID
--
Ketchum, ID
--
Ketchum, ID
Bid Date: Mar 21 2025
Ketchum, ID
Bid Date: Apr 23 2025
Ketchum, ID
Bid Date: Jan 22 2025
Ketchum, ID
Bid Date: Sep 19 2024
Ketchum, ID
--
Ketchum, ID
--
Ketchum, ID
Bid Date: Mar 21 2024
Ketchum, ID
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
