BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work, paving and new construction of a mixed-use development in Ketchum, Idaho. Completed plans call for the construction of a 1,000-square-foot playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Engineer's Estimate: $6M total Package 1: $3.5M Package 2: 1.2M Package 3: $1.3M But a friendly reminder, package 3 is the only one that is open to public bid, as the other bids require a qualified RFQ bid. The City of Ketchum is requesting submissions of qualifications for the following Project: Warm Springs Preserve Restoration Project Prequalification Warm Springs Preserve, a former golf course now preserved by the Ketchum community, offers a unique opportunity to enhance the landscape and restore critical ecosystems. The City of Ketchum developed a Vision Plan in 2022-2023, which outlines key restoration and infrastructure improvements needed for the Preserve. The City is open for public bid construction package pertaining to the Utilities, Welcome Building and Paving. Specifically, this section includes the construction of a new restroom and storage building, utilities installation, and paving for access roads and parking areas. The new building will meet the needs of park visitors and serve as an integral part of the Preserve's infrastructure. Utilities for the site, including water and electricity, will be installed to support the new restroom and storage facilities. The work also includes paving new access roads, parking lots, and trailheads, ensuring ease of access to all areas of the Preserve while adhering to ADA accessibility guidelines. Irrigation and Restoration aspects to the project have been pre-qualified and are closed to only those contractors who were accepted during that qualification period. Questions or concerns should also be addressed to tdonat@ketchumidaho.org. Warm Springs Preserve, a former golf course now preserved by the Ketchum community, offers a unique opportunity to enhance the landscape and restore critical ecosystems. The City of Ketchum developed a Vision Plan in 2022-2023, which outlines key restoration and infrastructure improvements needed for the Preserve. This plan, approved by the Ketchum City Council in April 2023, includes floodplain restoration, ADA-compliant trail upgrades, new irrigation systems, a small 1,000 SF restroom and storage building, and improvements to access and parking areas, all in alignment with the property’s deed of transfer requirements. This construction procurement package is divided into three primary scopes of work: 1. floodplain restoration, fairway improvements and preserve amenities, 2. the replacement of the irrigation system. 3. a new bathroom/storage building with associated utilities and drive

Post-Bid

Playgrounds / Parks / Athletic Fields

$6,000,000.00

Public - City

New Construction, Paving, Site Work

5

21

18

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 3, 2025

Project location map

To Be Determined, Ketchum, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.