BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and paving for a mixed-use development in Redwood Falls, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of September 19, 2025, project is under construction. Construction will suspend October 26, 2025, and resume in Spring 2026. Completion October 30, 2026. MnDOT requests responses for construction oversight monitoring of contaminated materials during project excavation, removal and replacement of all pavements, curb and gutter and sidewalk work, new storm sewer installation along Trunk Highway (TH) 19, along with improvements to the city water and sanitary sewer work. Contaminated material handling will include soil handling and disposal, groundwater dewatering, treatment and discharge, and possible regulated waste handling (debris) during construction of the MnDOT Project 4204-40 Hwy 19, Marshall, Minnesota Reconstruction Project. MnDOT is planning a large reconstruction (TH 19/College Drive) from 700 feet west of Marlene Street through the intersection of Bruce Street in the city of Marshall, Minnesota. The pavement has deteriorated, and the city of Marshall needs to replace aging utilities. Sidewalk improvements will be made along the project corridor in accordance with the ADA. A bike lane will be stripped from Marlene Street to just west of the Fairgrounds Road. Construction is planned to start in 2025 and is anticipated to take 2 years (2025 and 2026) to complete. Prospective, pre-qualified responders who have any questions regarding this request for letters of interest must submit questions, by e-mail, to the Contract Administrator: Jason Alcott, Contract Administrator jason.alcott@state.mn.us Questions regarding this announcement must be received, via e-mail, by the Contact Administrator identified above no later than 2:00PM Central Time on 03/24/2025. MnDOT anticipates posting answers to all questions received by 2:00PM Central Time on 03/25/2025. MNDOT: RFP Engineering - Construction Monitoring: Marshall Reconstruct

Under Construction

Roads / Highways

$25,700,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
16
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

Project location map

MN-19, Redwood Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.