Published September 13, 2025 at 8:00 PM
Updated November 23, 2025
Site work and paving for a road / highway in Coon Rapids, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://www.coonrapidsmn.gov/CivicAlerts.aspx?AID=4672 As part of the ongoing effort to add a third lane to Highway 10 in Coon Rapids, drivers have had to navigate some major ramp closures. CTN's Steve Antus has an update on the project. ----------------------------------------------------------------------------------------------- https://www.hometownsource.com/abc_newspapers/community/coonrapids/contract-awarded-for-highway-10-third-lane-project-in-coon-rapids/article_51bd0662-fdda-11ef-b7bd-ff3aca7c93f1.html A contract was awarded by the Minnesota Department of Transportation March 5 for the Highway 10 third-lane project in Coon Rapids. C.S. McCrossan Construction, Inc., Maple Grove, was the lowest of six bids in the amount of about $39.66 million for the project to build a third lane in each direction from 700 feet west of Creek Meadow Drive, just east of Hanson Boulevard, to 700 feet east of Round Lake Boulevard. The engineer’s estimate was $45.3 million. ___________________ https://www.hometownsource.com/abc_newspapers/community/coonrapids/mndot-goes-out-for-bids-on-highway-10-third-lane-project/article_7f245e8e-d8e1-11ef-bd6f-0f20e22c4ae3.html MnDOT goes out for bids on Highway 10 third-lane project Peter Bodley Contributin writer20 hrs ago 0 The Minnesota Department of Transportation has gone out for bids on the Highway 10 third-lane project in Coon Rapids with a Jan. 29 bid opening. _____________________________ US 10, From Gregory to the Half Waycrossing(Cr 40) (Eb & Wb), Cir & Sfdr, Install Jturn at Halfway Crossing (Cr40) Work type : Mill & Bit Ovly Mile : 9.7 Route : US 10 As of December 26, 2024, the project is in Conceptual status. Anticipated letting Year 2027. MNDOT- Mill & Bit Ovly - US 10 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$20,221,146.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 5, 2027
US-10, Coon Rapids, MN
Related To This Project
Coon Rapids, MN
Bid Date: Apr 16 2019
Coon Rapids, MN
Bid Date: Feb 25 2025
Coon Rapids, MN
Bid Date: Feb 25 2025
Coon Rapids, MN
Bid Date: Mar 06 2025
Coon Rapids, MN
Bid Date: Apr 07 2025
Coon Rapids, MN
Bid Date: Mar 21 2025
Coon Rapids, MN
Bid Date: Mar 24 2025
Coon Rapids, MN
Bid Date: Mar 28 2025
Coon Rapids, MN
--
Coon Rapids, MN
Bid Date: Jan 21 2025
Coon Rapids, MN
Bid Date: Dec 12 2024
Coon Rapids, MN
Bid Date: Dec 10 2024
Coon Rapids, MN
Bid Date: Nov 25 2024
Coon Rapids, MN
Bid Date: Jun 02 2021
Coon Rapids, MN
Bid Date: Oct 01 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.