Site work and paving for a road / highway in Coon Rapids, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 18, 2025, the project was awarded to Northwest Asphalt, with an awarded amount of $574,345.96.** For the following improvement Pavement Full Depth Reclamation Traffic Control 1 LS Reclaim Bituminous Surface 29,524 SY Bituminous Wear Course Pavement 3,750 TON Crosswalk Marking White (Paint) 150 SF Saw & Seal Joint 8,300 LF All bids shall be accompanied by a 5% bid bond payable to the City of Coon Rapids. The City of Coon Rapids reserves the right to reject or hold all bids for 60 days. Pavement Full Depth Reclamation Traffic Control 1 LS Reclaim Bituminous Surface 29,524 SY Bituminous Wear Course Pavement 3,750 TON Crosswalk Marking White (Paint) 150 SF Saw & Seal Joint 8,300 LF CONSTRUCTION SCHEDULE If the Contract is awarded by the City Council on March 4, 2025, it is anticipated that construction on this Contract could begin on May 12, 2025. The project includes full depth reclamation and repaving of the existing 2-inch pavement over 4" reclaimed gravel sections on the following City roadway segments: Base Bid 1. Flintwood Street from Main Street to 126th Lane 2. 126th Avenue from Flintwood Street to cul-de-sac 3. 126th Lane from cul-de-sac to 126th Avenue 4. 126th Avenue from Alder Street to cul-de-sac 5. 125th Lane from University Avenue to cul-de-sac 6. Alder Street from 125th Lane to 126th Lane 7. 126th Lane from Alder Street to University Avenue Alternate Bid 1. Xeon Boulevard from Northdale Boulevard to Xeon Street 2. Avocet Circle from Xeon Boulevard to cul-de-sac 3. Zilla Street from Xeon Boulevard to cul-de-sac 4. Yellow Pine Street from Xeon Boulevard to cul-de-sac The Contractor shall be given until June 26, 2025 (Final Completion) to complete all work on this project. Final completion is defined as all paving work completed. The Contractor shall not work on Saturdays, Sundays, or Holidays. No work shall begin prior to 7:00 a.m. on any day, which includes the movement or transport of equipment and materials to or from the project area. Work shall be completed by 10:00 p.m. in accordance with local ordinance, and so as not to cause any unreasonable nuisance to affected residents. Paving shall not begin until 7:30 a.m. to allow residents and business employee's reasonable opportunity to remove their vehicles from the work area. Under emergency conditions, these limitations may be waived by the consent of the Engineer in conjunction with qualified local authority. Failure to complete the work as specified shall subject the Contractor to liquidated damages as provided for in Section 29 of the General Conditions. The Contractor is required to continuously pursue work to completion to minimize inconvenience to property owners and businesses.

Award

Roads / Highways

$574,346.00

Public - City

Paving, Site Work

3

8

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
121
Bidding Soon
1,525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

May 12, 2025

Project location map

Multiple Locations, Coon Rapids, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.