BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2025 at 8:00 PM

Updated November 23, 2025

Site work and paving for a road / highway in Coon Rapids, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

https://www.coonrapidsmn.gov/CivicAlerts.aspx?AID=4672 As part of the ongoing effort to add a third lane to Highway 10 in Coon Rapids, drivers have had to navigate some major ramp closures. CTN's Steve Antus has an update on the project. ----------------------------------------------------------------------------------------------- https://www.hometownsource.com/abc_newspapers/community/coonrapids/contract-awarded-for-highway-10-third-lane-project-in-coon-rapids/article_51bd0662-fdda-11ef-b7bd-ff3aca7c93f1.html A contract was awarded by the Minnesota Department of Transportation March 5 for the Highway 10 third-lane project in Coon Rapids. C.S. McCrossan Construction, Inc., Maple Grove, was the lowest of six bids in the amount of about $39.66 million for the project to build a third lane in each direction from 700 feet west of Creek Meadow Drive, just east of Hanson Boulevard, to 700 feet east of Round Lake Boulevard. The engineer’s estimate was $45.3 million. ___________________ https://www.hometownsource.com/abc_newspapers/community/coonrapids/mndot-goes-out-for-bids-on-highway-10-third-lane-project/article_7f245e8e-d8e1-11ef-bd6f-0f20e22c4ae3.html MnDOT goes out for bids on Highway 10 third-lane project Peter Bodley Contributin writer20 hrs ago 0 The Minnesota Department of Transportation has gone out for bids on the Highway 10 third-lane project in Coon Rapids with a Jan. 29 bid opening. _____________________________ US 10, From Gregory to the Half Waycrossing(Cr 40) (Eb & Wb), Cir & Sfdr, Install Jturn at Halfway Crossing (Cr40) Work type : Mill & Bit Ovly Mile : 9.7 Route : US 10 As of December 26, 2024, the project is in Conceptual status. Anticipated letting Year 2027. MNDOT- Mill & Bit Ovly - US 10 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$20,221,146.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
149
Bidding Soon
1,513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2027

Project location map

US-10, Coon Rapids, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.