Published February 14, 2025 at 7:00 PM
Updated February 15, 2025
Site work and paving for a mixed-use development in Sheldon, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
** As of February 13, 2025, project was awarded to Van't Hof Concrete, no amount available. ** Work generally consists of approximately 800 square yards of existing PCC roadway removal and replacement to include, but not limited to: - Grading, Excavation, Subgrade Preparation and Modified Subbase - Storm Sewer Installation - 6" P.C. Concrete Sidewalk - 7" P.C. Concrete Pavement - Pavement Removals - Temporary Traffic Control - Erosion Control Items See Bid Form for exact quantities Site Directions: The intersections of E. 2nd St. and 23rd Ave. and E. 2nd St. and 24th Ave. in the City of Sheldon, Iowa Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. The work shall be completed as follows: All work shall be substantially completed within 30 working days once commenced All work shall be completed by June 20, 2025 By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa The right to accept or reject any or all bids and to waive informalities is reserved. Question Deadline 01/22/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing
Award
Roads / Highways
$225,611.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2025
March 31, 2025
Multiple Locations, Sheldon, IA
Related To This Project
Sheldon, IA
Bid Date: Jun 25 2021
Sheldon, IA
Bid Date: Feb 05 2025
Sheldon, IA
Bid Date: Feb 13 2025
Sheldon, IA
--
Sheldon, IA
--
Sheldon, IA
Bid Date: Dec 16 2025
Sheldon, IA
--
Sheldon, IA
Bid Date: Dec 17 2024
Sheldon, IA
--
Sheldon, IA
--
Sheldon, IA
Bid Date: Aug 27 2024
Sheldon, IA
Bid Date: Jan 22 2025
Sheldon, IA
Bid Date: Aug 27 2024
Sheldon, IA
Bid Date: Aug 13 2024
Sheldon, IA
Bid Date: Jul 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.