BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Renovation of a transportation facility in Traverse City, Michigan. Working plans call for the renovation of a transportation facility.

*As of July 28, 2025, a Construction Manager at Risk has been awarded. Design Development docs have been completed and the design team will move into Construction Documents. This project will begin in the second quarter of 2026. Request for Qualifications (RFQ): Construction Manager at Risk Services The Northwest Regional Airport Authority (NRAA) intends to select a firm (bidder) for Construction-Manager-At-Risk (CMAR) services for the TVC Terminal Addition program. The program includes existing concourse modification, concourse addition, and concourse connector. The Cherry Capital Airport Addition Project includes three main aspects an approximately 25,000 sf addition to the existing concourse (Concourse A) housing an expanded baggage make-up and security checkpoint, an approximately 60,000 sf concourse addition, (referred to as Concourse B in this report), an approximately 20,000 sf connector between Concourses A and B . Construction Document Start: July/August 2025 Construction Documents: Complete: Q1/2026 Construction: Q1/2026 - Q1/2028 Total Project Budget: $110M -$120M(including separately procured terminal apron phases) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Owner reserves the right to accept or reject, without consideration, any qualification which arrives late. Owner reserves the right to request additional information, any requests will be made to all firms.

Pre-Construction/Negotiated

Transportation Terminals

$120,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
25
Bidding Soon
251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

April 6, 2026

Project location map

727 Fly Don't Dr, Traverse City, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.