Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Apple Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: City Project 2024-158 Cobblestone Lake Park Trail Improvements 12,000 SY Remove / Reclaiming (3.0") of Asphalt Pavement 1405 SF Remove Concrete Walk 220 SF Remove Unit Pavers 1 LS Site Grading 200 CY Select Granular Borrow 100 CY Common Borrow 12,000 SY Bituminous Pavement Removal 4 EA Casting Assembly 8 LF Construct 84" Drainage Structure 18 LF Construct 48" Drainage Structure 300 LF Storm Sewer 12,000 SY Bituminous Trail Pavement 1000 SF 6" Concrete Walk 350 SF 5" Concrete Special Color 300 LF Concrete Curb and Gutter 220 SF Truncated Domes 13780 SY Site Restoration With related items The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. This project is subject to Minnesota Department of Labor and Industry Prevailing Wage and Truck Rental Rates. Bid Security in the amount of 5 percent of the amount of the Bid must be submitted through Surety 2000 using contract and accompany each Bid in accordance with the Instructions to Bidders. The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The as-read online Bid results will be available online following the Bid opening. Question Deadline 01/23/2025 at 12:00 PM CT No bidder questions will be addressed after date and time.
GC Bidding
Sidewalks / Parking Lot
$800,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 27, 2025
15601 Cobblestone Lake Pkwy, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: Dec 23 2024
Apple Valley, MN
--
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Sep 25 2024
Apple Valley, MN
Bid Date: Sep 16 2024
Apple Valley, MN
Bid Date: Sep 09 2024
Apple Valley, MN
Bid Date: Apr 25 2025
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Aug 27 2024
Apple Valley, MN
Bid Date: Oct 09 2024
Apple Valley, MN
Bid Date: Aug 19 2024
Apple Valley, MN
Bid Date: Aug 09 2024
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Jul 30 2024
Apple Valley, MN
Bid Date: Jul 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.