Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 26, 2025
Site work and renovation of a civil project in Browns Summit, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The scope of this project shall include but not be limited to the following: engineering design, contract administration, and construction services for the Project. All aspects of the project from design through completion and commissioning are included in the scope of work. The following general requirements are identified for this project (Additional detail provided in Exhibit A): o First and foremost, the DB Team will be required to maintain plant operations throughout construction. o The DB Team will be expected to review the PER and as the Engineer of Record for the design and construction of this project, confirm recommendations outlined in the PER. o The DB team shall provide the planning, design, construction, and maintenance of plant operations for the construction of the Advanced Treatment Facility (ATF) and associated appurtenances. The selected DB Team will be expected to consider the following items at a minimum: o Townsend Water Treatment Plant is rated at 30 mgd. Treatment must not limit the plants ability to distribute 30 mgd. o Electrical loading and the impacts or changes required to existing electrical facilities. o Siting the ATF appropriately for the City to expand the WTP in the future according to the City's master plan. o Demolition of existing picnic shelter, playground and bathroom building near the proposed new plant entrance. o Deep piping necessary for future Capital Improvements Projects (clearwell) shall be considered. o A new 36” DIP watermain is under contract to begin construction by the end of the year along the east side of the drive into the plant. Final design needs to take into account future maintenance of the line if necessary. o Integration to the plant’s SCADA system for monitoring is required. o Design needs to consider removal of spent media and traffic patterns. o Stormwater controls are expected. The City reserves all right to the contents of the final scope and budget for all phases of the project.
Post-Bid
Water / Sewer
$120,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2025
January 26, 2026
6269 Townsend Rd, Browns Summit, NC
Related To This Project
Browns Summit, NC
Bid Date: Dec 02 2025
Browns Summit, NC
Bid Date: Aug 21 2025
Browns Summit, NC
--
Browns Summit, NC
--
Browns Summit, NC
Bid Date: Dec 05 2024
Browns Summit, NC
--
Browns Summit, NC
Bid Date: May 09 2024
Browns Summit, NC
Bid Date: Aug 31 2022
Browns Summit, NC
Bid Date: Dec 13 2021
Browns Summit, NC
Bid Date: Nov 07 2019
Browns Summit, NC
Bid Date: Aug 01 2022
Browns Summit, NC
--
Browns Summit, NC
--
Browns Summit, NC
Bid Date: Mar 28 2023
Sylva, NC
Bid Date: Oct 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
