Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2025 at 8:00 PM
Updated January 31, 2026
Site work and paving for a mixed-use development in Murrieta, California. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The work to be done consist of furnishing all materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated project. The project description is as follows: The proposed street improvement project is located on Murrieta Hot Springs Road between Margarita Road and Winchester Road, approximately one and a half miles east of Interstate 215. The primary focus of the project is to widen Murrieta Hot Springs Road from four lanes to six lanes, with new traffic signals at the intersection of Murrieta Hot Springs Road and Calle Del Lago, and a signal modification at Murrieta Hot Springs Road and Via Princesa. Other improvements consist of but are not limited to: sidewalks, street light installation, water quality bmp's, landscaped and hardscaped raised medians clearing and grubbing, pavement rehabilitation, cold milling, utility coordination, signing and striping, etc. The proposed project requires the installation of drilled soldier pile retaining wall systems on both sides of Murrieta Hot Springs Road as high as fifteen feet (15') in some areas. Short planter walls are proposed in some areas where the soldier pile wall exceeds a certain height. The project also proposes to shift and realign a private street (Via Frontera) approximately six feet (6') to the north within the Ridgegate/Rhonda Association private community (located at Murrieta Hot Springs Road and Calle Del Lago) in order to accommodate the street widening of Murrieta Hot Springs Road. Utility relocations such as water, gas, electricity, lighting and irrigation also occur within the Rhonda Association community as a result of Via Frontera being shifted and realigned to the north. License Requirements Class A Liquidated Damages $2,000.00 Per Working Day Online Q&A Yes Q&A Deadline 04/14/2025 2:00 PM (PDT)
Bid Results
Roads / Highways
$15,236,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
June 16, 2025
Murrieta Hot Springs Rd, Murrieta, CA
Related To This Project
Murrieta, CA
Bid Date: Feb 05 2025
Murrieta, CA
Bid Date: Feb 25 2025
Murrieta, CA
Bid Date: Feb 17 2025
Murrieta, CA
Bid Date: Jan 29 2025
Murrieta, CA
Bid Date: Feb 26 2025
Murrieta, CA
Bid Date: Mar 19 2025
Murrieta, CA
Bid Date: Mar 27 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
