Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2024 at 7:00 PM
Updated December 17, 2024
Site work and paving for a road / highway in Murrieta, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
For the following Asphalt Paving, Sealcoating & Repair / Districtwide Asphalt Paving, Sealcoating and Repair and Concrete Repair and Maintenance A. PROVISIONS 1. The contractor shall provide all labor, equipment, tools, and material necessary to complete work commissioned pursuant to this bid award. 2. The contractor shall exercise extreme caution in demolition and compaction where underground utilities are indicated and pavement repairs indicate underground utilities, or are reasonably inferred. 3. The raising and lowering of utility boxes to finish grade shall be part of the Contract. 4. Any damage to buildings, grounds, pavement, etc., resulting from the construction operation shall be repaired by the contractor in an approved manner at no cost to MVUSD. 5. The contractor shall comply with all applicable codes, ordinances, and safety regulations. All work shall be performed in a workmanlike manner. Contractor is responsible to ensure material and labor is in accordance with all applicable industry standards. 6. The contractor shall exercise all reasonable and necessary means to abate undue dust and noise at all time. 7. The contractor shall notify Sean Jackson, Supervisor, or Raul Esteves, Maintenance Director a minimum of two daysin advance before starting any phase of this contract. At that time, a starting priority per site will be established. 8. The contractor shall notify Sean Jackson, Supervisor, or Raul Esteves, Maintenance Director one day in advance before subgrade, base, or asphalt work is started at any site. 9. Parking or road areas shall receive 1/2" type III C-3 asphalt concrete and conform to Caltrans specifications.
Award
Roads / Highways
$104,495.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2024
December 20, 2024
Multiple Locations, Murrieta, CA
Related To This Project
Murrieta, CA
--
Murrieta, CA
--
Murrieta, CA
Bid Date: Jan 07 2025
Murrieta, CA
--
Murrieta, CA
Bid Date: Apr 17 2025
Murrieta, CA
Bid Date: Feb 05 2025
Murrieta, CA
Bid Date: Feb 25 2025
Murrieta, CA
Bid Date: Feb 17 2025
Murrieta, CA
Bid Date: Oct 23 2024
Murrieta, CA
Bid Date: Oct 21 2024
Murrieta, CA
Bid Date: Oct 24 2024
Murrieta, CA
Bid Date: Oct 23 2024
Murrieta, CA
Bid Date: Oct 25 2024
Murrieta, CA
Bid Date: Oct 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
