BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a mixed-use development in Ferndale, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This project is the Sidewalk Rehabilitation between Harlan Avenue and Midway Drive in Ferndale Borough, Cambria County. The project will replace the existing dilapidated walkways with new concrete sidewalks and stairs, handrails, and drainage up to the current code requirements and increase the egress safety of residents and students as indicated on the approved drawings included in the bid package. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 9% Structure Work: 0.00% Pre-Bid Meeting: None Anticipated NTP: 08/18/2025 Wage Rates: Yes Required Completion: 10/02/2025 Prequalification Requirement: Yes State Type of Work: Miscellaneous *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT: Station Street Walkway Rehab, Phase 2

Award

Sidewalks / Parking Lot

$161,009.00

Public - State/Provincial

Paving, Site Work

15

9

8

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
101
Bidding Soon
1,448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

August 18, 2025

Project location map

Station St, Ferndale, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.