Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 2, 2025 at 7:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Dover, Delaware. Contact the soliciting agency for additional information.
Hauling of Leachate from the Central Solid Waste Management Center, Contract No. S-24-912-CS, and for the Hauling of Leachate from the Southern Solid Waste Management Center, Contract No. S-24-913-SS for the Delaware Solid Waste Authority The Work under Contract No. S-24-912-CS is generally described as the furnishing of all labor, materials, equipment, permits, and incidentals necessary to safely and legally haul landfill leachate from the Central Solid Waste Management Center (CSWMC) to the Cherry Island Landfill (CIL), or to the Kent County Regional Waste Water Treatment Plant (Kent County). The Work under Contract No. S-24-913-SS is generally described as the furnishing of all labor, materials, equipment, permits, and incidentals necessary to safely and legally haul landfill leachate from the Southern Solid Waste Management Center (SSWMC) to the Cherry Island Landfill (CIL), or to the Seaford Waste Water Treatment Plant (Seaford). Work required for Contracts S-24-912-CS and S-24-913-SS are further described in the RFP as is the criteria for determining the successful PROPOSER(S). Subject to the terms of the RFP, each Contract will be for a period of three (3) years, unless DSWA exercises in its sole discretion, the right to extend the contract(s) for a fourth and/or fifth year under the same terms and conditions. The contract(s) will begin April 29, 2025. DSWA reserves the right to award the two contracts to one PROPOSER or to two separate PROPOSERS as set forth by the criteria in the RFP. The PROPOSER must submit with their Proposal, documentation indicating they are licensed to conduct business in the State of Delaware and PROPOSER must meet and comply with all state, local, and federal laws, regulations, ordinances, and requirements in the scope of their Work and complying with any licensing and permitting requirements. The Delaware Solid Waste Authority reserves the right to accept or reject any or all Proposals which in its judgment is in the best interest of DSWA, and all PROPOSERS are notified that such acceptance or rejection shall be without liability on the part of DSWA for any action brought by any PROPOSER because of such acceptance or rejection. Likewise, DSWA reserves the right to waive any requirement or irregularity in the RFP process without liability on the part of DSWA. The submittal of a proposal in response to this Notice shall constitute an agreement of the PROPOSER to all the provisions set forth in this Notice and the RFP. No PROPOSER may withdraw their Proposal within ninety (90) days after the actual date of opening thereof, except as may be authorized by the Project Manual. The Project Manual explains the process by which prospective PROPOSERS may submit questions about the meaning or intent of the Project Manual. All inquiries made pursuant to the terms of the RFP shall be directed to: Adolf A. Korosec Sr. Landfill Supervisor Phone: 302-875-3448 Fax: 302-875-5204 E-mail: aak@dswa.com and Simone George Administrative Assistant Phone: 302.739.5361 Fax: 302.739.4287 E-mail: smg@dswa.com
Post-Bid
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
April 29, 2025
Multiple Locations, Dover, DE
Related To This Project
Dover, DE
Bid Date: Feb 12 2025
Dover, DE
Bid Date: Feb 18 2025
Dover, DE
Bid Date: Feb 13 2025
Dover, DE
Bid Date: Feb 03 2025
Dover, DE
Bid Date: Mar 06 2025
Dover, DE
Bid Date: Feb 06 2025
Dover, DE
Bid Date: Mar 19 2025
Dover, DE
Bid Date: Mar 18 2025
Dover, DE
Bid Date: Mar 14 2025
Dover, DE
Bid Date: Jan 15 2025
Dover, DE
Bid Date: Jan 17 2025
Dover, DE
Bid Date: Jan 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Hauling of Leachate from the Central Solid Waste Management Center (CSWMC) and Southern Solid Waste Management Center (SSWMC)
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.