Site work and new construction of a parking garage in Boise, Idaho. Completed plans call for the construction of a parking garage; and for site work for a parking garage.

Construction Manager / General Contractor (CM/GC) Services: 1010 W. Jefferson St. Parking Facility Capital City Development Corporation (CC DC), the urban renewal agency for the city of Boise, Idaho, will accept submissions about qualifications from companies licensed in Idaho with both construction manager and public works contractor licenses to perform CM/GC services for the agency's 1010 W. Jefferson St. Parking Facility. CC DC anticipates using the CM/GC delivery process to complete this project. Desired Program 1. ParkBOI: Approximately 300-500 parking stalls in a four- or five-story structure. The final stall amount will be determined following additional demand studies by the design team and selection and refinement of a design concept. 2. BikeBOI: An approximately 650 square-foot space on the ground floor providing secure public storage for 30 bicycles. 3. Retail Space: As much square feet of shelled out space intended for future active retail use on the ground floor as is practical. Approximately 5,000 square feet may be used as a medical clinic. 4. Day Care Facility: Approximately 12,000 square-foot shelled out space intended for future use as a day care facility including outdoor space required by code. CM/GC Major Work Elements 1. Building demolition, utility relocation, new utility services, streetscape improvements, and site improvements. 2. Construction of a four- or five-story structure with approximately 300 to 500 parking stalls and a shelled out ground floor space. 3. Construction of vertical vehicle circulation including a continuous ramp conforming to current code requirements. 4. Construction of a minimum of two elevators, accessed via fully enclosed and conditioned lobby spaces protected from weather elements. Elevator lobbies will have doorways/ windows/glazing at all levels which provide visibility to the street and into the parking garage. 5. Construction of a minimum of two fully enclosed stair towers adjacent to the elevator shafts. Stair towers will have doorways/windows/glazing at all levels which provides visibility to the street and into the parking garage. 6. Construction of on-site rooftop solar power generation and electric vehicle charging infrastructure. 7. Provide Parking Access and Revenue Control System (PARCS) equipment consistent with the rest of the ParkBOI system. 8. Provide exterior and interior ParkBOI signage and wayfinding. 9. Coordination with other general contractors building out the ground floor tenant improvements. 2.4 Project Schedule This preliminary schedule is included to provide an idea of the timeframe in which this project is expected to be completed. The interim deadlines are tentative and CCDC expects this schedule to be refined based on feedback from the design team and the selected CM/GC as part of preconstruction services. The completion date below is not based on hard deadlines tied to funding or other outside influences. Activity Duration Deadline CM/GC RFQ Issued December 31, 2024 Pre-Proposal Meeting January 15, 2025 at 2 pm Last Day for Questions January 30, 2025 Questions Answered February 3, 2025 Statements of Qualifications Due 4.5 weeks February 7, 2025 Any questions, clarifications or objections must be received no later than 3:00 pm on January 30, 2025. Direct questions to: Kathy Wanner, Contracts Manager (208) 391-7304 or kwanner@ccdcboise.com The CM/GC ranked highest from this Request for Qualifications(RFQ) process will be asked to negotiate a contract. If a contract cannot be negotiated, CD C will ask the next highest ranked company to negotiate a contract. Companies are not guaranteed work nor compensation until under contract with CC DC. Direct questions to CC DC at(208) 384-4264 or kwanner@ccdcboise.com. CC DC reserves the right to acceptor reject any or all proposals.

GC Bidding

Parking Garage

$100,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
154
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

June 9, 2025

img_map_placeholder

1010 W Jefferson St, Boise, ID

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.