BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work and paving for a mixed-use development in Advance, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The majority of the project improvements proposed for this project are associated with a Community Crossing Matching Grant (CCMG).The project improvements generally consist of approximately 3,425 square yards of pavement milling, approximately 413 tons of hot mix asphalt surface paving, 7,794 square feet of concrete sidewalk, 6,258 square feet of existing sidewalk removal, one drainage structure and 6 pipe, traffic maintenance, and miscellaneous work to complete the project. Each bid shall be accompanied by a certified check or acceptable bid bond made payable to the Town of Advance, Indiana, (Owner), in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time he executes his contract. The bond will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days. Question Deadline 01/23/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Gary Ladd, Ladd Engineering Inc., 1127 Brookside Dr. Lebanon, IN 46052. Email address: gary@laddengr.com. Telephone number 765-482-9219. Bid Result - Wall Street - 800' East of Town Limits to SR 75 - Midwest Paving - $ 140,867.40 Oak Street - SR 75 to Ash - All Star Paving, Inc - $ 15,602.95 Alley - Cherry to Wall - Baumgartner & Company - $ 6,780.00

Award

Roads / Highways

$163,250.00

Public - City

Paving, Site Work

8

10

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

February 26, 2025

Project location map

Multiple Locations, Advance, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.