Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 24, 2025 at 7:00 PM
Updated January 29, 2025
Site work for a power facility in Nevada, Missouri. Completed plans call for site work for a power facility.
Moundville Transmission Main Upgrade BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT for all parts of the entire project within 90 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $500 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions. Upon request and receipt of the document deposit plus a non-refundable shipping charge, ADS will transmit the Bidding Documents via delivery service. The shipping charge amount will depend on the shipping method selected by the prospective Bidder. The date that the Bidding Documents are transmitted by ADS will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from ADS. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than ADS.The date that the Bidding Documents are transmitted by ADS will be considered the Bidder's date of receipt of the Bidding Documents The CONTRACT DOCUMENTS may be examined at the following locations: M Q Q Q Q Q 1. Bartlett & West, Inc., 601 Monroe Street, Suite 201, Jefferson City, MO 65101, on Mondays through Fridays between the hours of 8:00 A.M. and 4:30 . 2. Office of CPWSD No. 1 of Vernon County, MO, 3414 E Austin Blvd, Nevada, MO 64772 on Mondays through Fridays between the hours of 8:00 A.M. and 4:00 P. 3. American Document Solutions, 1400 Forum Boulevard, Suite 7A, Columbia, MO 65203, Phone: (573) 446-7768, Fax: (573) 355-5433, Email: orders@adsmo.net, Locations of existing water lines are approximate. Contractor shall pothole locations around tie-ins, highway and water way crossings, at bends, and any other locations as needed or directed by the plans to confirm locations of existing pipe before installing proposed pipe. Contractor shall include cost associated with potholing and locating existing water lines in the bid. Additional compensation beyond bid price will not be considered.
Post-Bid
Power Plant
$750,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 27, 2025
To Be Determined, Nevada, MO
Related To This Project
Nevada, MO
Bid Date: Mar 19 2025
Nevada, MO
Bid Date: May 16 2025
Nevada, MO
Bid Date: Apr 29 2025
Nevada, MO
Bid Date: Jun 19 2020
Nevada, MO
Bid Date: Oct 16 2020
Nevada, MO
Bid Date: Jul 30 2025
Nevada, MO
--
Nevada, MO
Bid Date: Aug 18 2025
Nevada, MO
Bid Date: Jan 08 2025
Nevada, MO
Bid Date: Dec 09 2024
Nevada, MO
Bid Date: Dec 09 2024
Nevada, MO
Bid Date: Oct 16 2024
Nevada, MO
Bid Date: Jan 16 2026
Nevada, MO
Bid Date: Sep 24 2024
Nevada, MO
Bid Date: Sep 25 2024