Published March 26, 2025 at 8:00 PM

Updated December 12, 2025

Site work and renovation of a civil project in Williston, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Improvements at Elko Street Well include replacement of the vertical turbine motor, well pump evaluation, variable frequency drive and control panel, chemical system upgrades, generator, building rehabilitation, conditioning electrical room, fascia and vented soffit carpentry, and appurtenances. Improvements at the State Street Well include replacement of the vertical turbine motor, well evaluation, water testing, variable frequency drive and control panel, conditioning well house, control valves, meter, filtration system, canopy, concrete, piping, site grading, generator, and appurtenances. Turnipseed Engineers in Augusta at 4210 Columbia Road, Building 3, Augusta, Georgia 30907 and in Atlanta at 2255 Cumberland Parkway SE, Building 400, Atlanta, Georgia 30339. The Owner reserves the right to reject any or all bids and to waive informalities. Time allotted for completion of State Street Well Evaluation and Groundwater Testing is 45 days. Time allotted for the total project is 330 consecutive days. Proposals for the complete work in one general contract shall be made on the proposal forms provided and shall contain prices in words and figures for the work bid on. The project is proposed to be funded with South Carolina Infrastructure Investment Program. All applicable state and federal requirements identified in the bid documents apply. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of 90 days. All proposals shall be accompanied by a Bid Bond drawn in favor of the Town of Williston, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Town of Williston. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the Town of Williston as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract.

Bid Results

Water / Sewer

$2,529,835.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
62
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 6, 2026

Project location map

Elko St, Williston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.