Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2025 at 7:00 PM
Updated February 13, 2025
Site work and paving for a sidewalk / parking lot in Dyer, Tennessee. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
renovation/replacement of a portion of sidewalk on South Main & Ashley St in Dyer, Tennessee. Additional information is available from Ashlee Starkey at 731-692-3767. The City of Dyer reserves the right to accept and/or reject any and all bids and to permit any exceptions. The work described consists of furnishing all labor, materials, tools, equipment, and services and performing all work required to, as directed, prepare subgrade, rehabilitate the subbase, install gravel base to repair/level the sidewalk base. Place a uniform wearing surface in accordance with these specifications on the following sidewalks: Sidewalks & Wall Quantity (SF) South Main Street & Ashley St Sidewalk 975 Retaining Wall 260 Total 1235 The quantities of work identified in the table above are estimated and may vary with actual field applications. The contractor is responsible for verifying quantities to prepare their bid. The work described shall be all in accordance with TDOT Standard Specifications for Road and Bridge Construction.
Award
Sidewalks / Parking Lot
$18,255.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2025
February 10, 2025
Multiple Locations, Dyer, TN
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
