BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2025 at 8:00 PM

Updated July 15, 2025

Renovation of a water / sewer project in Dyer, Tennessee. Completed plans call for the renovation of a wastewater treatment plant.

**As of July 14,2025, the project was awarded to Waterserv, with an awarded amount of $394,207.50.** Question Deadline 06/25/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing, Submit all questions via email to Laurie Smith, Project Coordinator (lauries@a2h.com). DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is indicated on the drawings and specified in Section 02 4100. B. Hazardous Substances: Discovery of a suspected dangerous or hazardous substance during construction stops construction operations and may seriously delay a project. Contractors often encounter asbestos, lead, polychlorinated biphyenyls (PCBs), and similar hazardous materials on their construction projects. Because the use of those materials was common until recently, they are often found on renovation projects involving older buildings. AIA Document A201 outlines procedures contractors must follow when suspected dangerous or hazardous substances are uncovered during construction. If the suspect material proves to be a dangerous or hazardous substance, a contractor is not permitted to resume construction operations until the material has been rendered harmless or has been lawfully removed from the site. C. Scope of alterations work is indicated on drawings. D. Notice: In no event is a product to be used in this project known to contain any hazardous or toxic waste or material, radioactive materials, or other contaminants, the removal of which is required or the maintenance of which is prohibited, regulated or penalized by any local, state, or federal agency, authority or governmental unit. If any product is inadvertently specified which contains such materials, it is the contractors, subcontractors and suppliers obligation and duty to advise the Engineer of this fact prior to the ordering and/or installing of the product or material

Award

Water / Sewer

$394,207.00

Public - City

Renovation

15

23

7

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
48
Bidding Soon
677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

Project location map

199 Becton St, Dyer, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.