BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work, paving and outdoor lighting for a civil project in Richland, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and water / sewer project.

This project will construct a new 2-lane street with pedestrian facilities, bike lanes, streetlights and storm drainage facilities from Clubhouse Lane to Van Giesen Street. As of December 9, 2025, this project is included in the city's 2025- 2030 Capital Improvement Program (CIP). It is currently in the conceptual phase. No design firm has been selected yet. Design will not begin until 2026 or 2027.

Conceptual

Roads / Highways

$8,481,818.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
36
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2028

Project location map

Kingsgate Way, Richland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.