BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated December 2, 2025

Site work and new construction of a data center facility in Richland, Washington. Completed plans call for the construction of a 13,750-square-foot data center facility; and for site work for a data center facility.

Pacific Northwest National Laboratory (PNNL) is managed and operated by Battelle for the U.S. Department of Energy's (DOE) and is widely recognized as a leader in conducting world-class science. The Secure Computational and Data Sciences (SCDS) facility shall provide secure research and analysis space to support projects, including a collection of efforts for the DOE's Office of Science and the National Nuclear Security Administration. For these projects, only secured networks can be used. The SCDS facility will expand PNNL's ability to tackle complex scientific challenges and national security. This action is for the design and construction of the SCDS facility and will include the following minimum specifications: Provide a single-story building with a minimum gross building of 13,750 square feet (sf). The facility shall deliver the minimum space program requirements defined within this Request for Qualifications and supporting documentation. Note: The actual size may be larger based on the possible implementation of Additive Alternates. All square-footage calculations shall be performed per American National Standards Institute (ANSI)/Building Owners and Managers Association (BOMA) Z65.2--2019. The facility shall be sited on the PNNL campus in Richland, Washington. It shall be located on the north side of Horn Rapids Road, within the NSRC footprint, south of the Secure Physical Sciences building. Provide a data center capable of housing 35 server racks at the initial buildout. 7 racks will be high powered (40kW) units while the other 28 will be standard (10kW) units. Provide additional space to allow for the installation of future server racks and cooling equipment. The data center shall have the flexibility to expand to house 60 server racks total. Provide at least 24 workstations in the enhanced area (excluding server room office) with a mix of hard-walled offices and high-partition cubicles with privacy doors. Please note that a 5% deviation in the ratio below is acceptable, while providing the minimum number of workstations requested. o Workstation: Private C: 50% o Workstation: Private B: 8% o Workstation: Open D: 42% Meet all security construction standards specified within these documents for the SCDS building, including facility standoff/setback requirements. The applicable setback requirements include: 1. 100-ft standoff from facilities to perimeter fence 2. 150-ft standoff from facilities to access controlled parking areas and roadways within the fenced perimeter 3. 330-ft standoff from facilities to uncontrolled parking area and non-PNNL property primary energy source. Provide a lobby with a waiting area and the associated security vestibule. Provide utility support spaces, such as mechanical, electrical, and information technology (IT)server/intermediate distribution frame (IDF) rooms. Provide site improvements including the required utility infrastructure, paved vehicular access areas, pedestrian circulation, and landscaping. Additive Alternate #1: Provide an additional 5 workstations while maintaining the ratios requested above. Additive Alternate #2: Provide an additional 10 workstations while maintaining the ratios requeste

Post-Bid

Data Centers

$6,500,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
22
Bidding Soon
391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

March 18, 2026

Project location map

To Be Determined, Richland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.