Published November 18, 2025 at 7:00 PM
Updated December 2, 2025
Site work and new construction of a data center facility in Richland, Washington. Completed plans call for the construction of a 13,750-square-foot data center facility; and for site work for a data center facility.
Pacific Northwest National Laboratory (PNNL) is managed and operated by Battelle for the U.S. Department of Energy's (DOE) and is widely recognized as a leader in conducting world-class science. The Secure Computational and Data Sciences (SCDS) facility shall provide secure research and analysis space to support projects, including a collection of efforts for the DOE's Office of Science and the National Nuclear Security Administration. For these projects, only secured networks can be used. The SCDS facility will expand PNNL's ability to tackle complex scientific challenges and national security. This action is for the design and construction of the SCDS facility and will include the following minimum specifications: Provide a single-story building with a minimum gross building of 13,750 square feet (sf). The facility shall deliver the minimum space program requirements defined within this Request for Qualifications and supporting documentation. Note: The actual size may be larger based on the possible implementation of Additive Alternates. All square-footage calculations shall be performed per American National Standards Institute (ANSI)/Building Owners and Managers Association (BOMA) Z65.2--2019. The facility shall be sited on the PNNL campus in Richland, Washington. It shall be located on the north side of Horn Rapids Road, within the NSRC footprint, south of the Secure Physical Sciences building. Provide a data center capable of housing 35 server racks at the initial buildout. 7 racks will be high powered (40kW) units while the other 28 will be standard (10kW) units. Provide additional space to allow for the installation of future server racks and cooling equipment. The data center shall have the flexibility to expand to house 60 server racks total. Provide at least 24 workstations in the enhanced area (excluding server room office) with a mix of hard-walled offices and high-partition cubicles with privacy doors. Please note that a 5% deviation in the ratio below is acceptable, while providing the minimum number of workstations requested. o Workstation: Private C: 50% o Workstation: Private B: 8% o Workstation: Open D: 42% Meet all security construction standards specified within these documents for the SCDS building, including facility standoff/setback requirements. The applicable setback requirements include: 1. 100-ft standoff from facilities to perimeter fence 2. 150-ft standoff from facilities to access controlled parking areas and roadways within the fenced perimeter 3. 330-ft standoff from facilities to uncontrolled parking area and non-PNNL property primary energy source. Provide a lobby with a waiting area and the associated security vestibule. Provide utility support spaces, such as mechanical, electrical, and information technology (IT)server/intermediate distribution frame (IDF) rooms. Provide site improvements including the required utility infrastructure, paved vehicular access areas, pedestrian circulation, and landscaping. Additive Alternate #1: Provide an additional 5 workstations while maintaining the ratios requested above. Additive Alternate #2: Provide an additional 10 workstations while maintaining the ratios requeste
Post-Bid
Data Centers
$6,500,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2025
March 18, 2026
To Be Determined, Richland, WA
Related To This Project
Richland, WA
Bid Date: Dec 09 2025
Richland, WA
--
Richland, WA
Bid Date: Nov 21 2025
Richland, WA
Bid Date: Dec 05 2025
Richland, WA
Bid Date: Dec 19 2025
Richland, WA
Bid Date: Dec 23 2025
Richland, WA
--
Richland, WA
Bid Date: Jan 06 2026
Richland, WA
Bid Date: Nov 18 2025
Richland, WA
Bid Date: Nov 04 2025
Richland, WA
Bid Date: Oct 14 2025
Richland, WA
Bid Date: Nov 05 2025
Richland, WA
Bid Date: Oct 31 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.