BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work and renovation of a civil project in Palo Pinto, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work will consist of electrical and controls design services for the new SBR system. The controls will be integrated into the existing SCADA system on-site. A new Aqua Aerobic sequencing batch reactor system is proposed for improvements to the existing wastewater treatment plant in the northwest area of Palo Pinto in Palo Pinto County, Texas. An electrical SCADA system exists at the site that controls existing equipment. Electrical design services are requested for new electrical equipment proposed within the SBR system along with electrical connections to new submersible pumps in the existing influent lift station. Burgess & Niple, Inc. request the submission of qualification statements which will lead to the possible award of contract to provide Electrical Engineering Service for a project involving Palo Pinto County WWTP Improvements. The WWTP improvements include the construction of a Sequencing Batch Reactor (SBR) unit, including SBR treatment basins, treatment equipment, plant piping, and rehabilitation of the existing lift station. The project will be funded through the Texas Water Development Board's (TWDB) Clean Water (CWSRF) State Revolving Fund and ARPA for Construction Phase services. Execution of a subconsultant contract for this project is contingent upon release of funds from TWDB. This procurement is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA- approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details of the DBE Program and the current, applicable fair share goals, please visit Online Mbe: Construction 24.50%; Non-construction 24.05%; Total Combined Construction and Non-construction 24.16%. Wbe: Construction 11.34%; Non-construction 19.35%; Total Combined Construction and Non-construction 17.38%.

Post-Bid

Water / Sewer

$750,000.00

Public - County

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
82
Bidding Soon
1,386
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

March 3, 2025

Project location map

238 Oak St, Palo Pinto, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.