BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Renovation of a manufacturing facility in Dayton, Ohio. Conceptual plans call for the renovation of a 51,000-square-foot manufacturing facility.

Integrated Technology Education Center Submit all questions regarding this RFQ in writing to Purchasing at RFP@sinclair.edu with the project number included in the subject line (no phone calls please). Questions are due on January 9, 2026 by 2:00pm EST. Renovate Sinclair Community College's Building 8 Fieldhouse for the Integrated Technology Education Center (ITEC), to establish a flexible, centralized hub for technology and innovation on the Dayton Campus. This project will include the renovation of 36,000 SF existing space, plus the addition of a new mezzanine level comprising between 5,000 SF and 15,000 SF of new floor space. New construction will include an entrance lobby at the south end of building with drive & parking adjacent to Fourth Street at Robert Drive. The facility will feature modern technology laboratories and is expected to support over 7,500 students annually. The initiative aims to centralize learning and research across multiple disciplines for the convergence of Information Technology (IT), Cybersecurity, and Artificial Intelligence (AI). It is designed to prepare students across all academic divisions for a workforce where these technologies are fundamental tools. The new space and all new construction shall meet Sinclair standards for structure, finishes, lighting, etc. with new features and aesthetics being applied. This new Center shall include a data center, student-run SNOC (Security Network Operations Center), space for offices, hoteling, multifunction workstations, think tank, maker spaces, workforce partner spaces, conferences rooms, lounge, flex, and program storage. Anticipated Schedule Professional Services Start: 03 / 26 Construction Notice to Proceed: 09 / 26 Substantial Completion of all Work: 01 / 28 Professional Services Completed: 03 / 28 As of February 3, 2026, short list/design team not yet available.

Conceptual

Manufacturing

$28,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
190
Bidding Soon
2,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

September 1, 2026

Project location map

444 W Third St, Dayton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.