BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and addition to a transportation facility in Medford, Oregon. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

Request for Qualifications and Proposals notice is Hereby Given That Jackson County, Through Its Airport Department, is Soliciting a Qualified and Experienced Firm to Provide Construction Manager/general Contractor (Construction Manager at-risk) Services for Its Proposed Passenger Terminal Expansion at Rogue Valley International - Medford Airport, 1000 Terminal Loop Pkwy Medford, Oregon, 97504. Question Deadline 02/27/2026 Questions concerning this RFQ/P shall be directed to the Single Point of Contact via email at: AndrieCW@jacksoncountyor.gov. MFR's existing airport terminal building is approximately 80,000 square feet and consists of 2 levels (First and Second Floors), along with approximately 19,000 square feet of existing support canopy space. The project is anticipated to include the addition of approximately 97,000 square feet and a renovation and reconfiguration of approximately 50,500 square feet to the existing building, increasing the total terminal building and support operation areas to approximately 188,000 square feet. The project scope includes a new concourse and holdrooms, passenger boarding bridges, concessions space, new restrooms and support spaces, baggage claim addition, and landside and airside civil/airfield improvements. The scope will also include new mechanical, electrical, plumbing, and IT/security systems supporting the building expansion, as well as upgrades to the existing systems such as HVAC modernization for existing areas. The Airport Terminal Expansion design was approved in Board Order #181-25, authorizing RS&H to provide architectural and engineering services related to the design, permitting, and construction administration of the Terminal Expansion Project.

Post-Bid

Transportation Terminals

$175,000,000.00

Public - County

Addition, Demolition, Site Work

12

14

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
29
Bidding Soon
250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

November 2, 2026

Project location map

1000 Terminal Loop Pkwy, Medford, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.