Published February 24, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Leechburg, Pennsylvania. Completed plans call for site work for a water / sewer project.

Sealed bids will be received by the Municipal Authority of Allegheny Township, Westmoreland County, Commonwealth of Pennsylvania, for the following: SEWAGE SYSTEM IMPROVEMENTS. No Bid may be withdrawn for a period of one hundred twenty (120) days after the time of the opening of the bids. Bidders are required to attend and participate in the conference. The ENGINEER will transmit to all prospective Bidders of record such Addenda, as the ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. Prevailing Wage Rates must be paid on this project, and the CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color or national origin. BIDDER'S SURETY -- A certified check payable to the Municipal Authority of Allegheny Township or a bid bond on the bid form executed by the Bidder and a surety company approved by the OWNER, in an amount equal to ten percent (10%) of the total amount of bid, must be submitted with each bid or bids will be considered nonresponsive and immediately rejected. Questions Due Date: Feb 1st 2025, 11:00 AM EST SUCCESSFUL BIDDING BIDDER awarded this contract shall provide a performance surety in the amount of one hundred percent (100%) of the Contract amount. EQUAL OPPORTUNITY EMPLOYER -- the Municipal Authority of Allegheny Township fully complies with the provisions of this act. All qualified bidders are invited to submit a proposal. THE MUNICIPAL AUTHORITY OF ALLEGHENY TOWNSHIP BOARD RESERVES THE RIGHT TO AWARD OR TO REJECT ANY AND/OR ALL PORTIONS THEREOF PROPOSALS SUBMITTED, AND TO WAIVE INFORMALITIES IN THE BIDDING PROCESS IF IN THE BEST INTEREST OF THE AUTHORITY. The work included under these contracts covers the furnishing of all labor, materials, tools, and equipment required to complete the work as described herein, shown on the Contract Drawings, and necessary for complete operating facilities. The work under Contract No. 2024-01 generally consists of General/Mechanical Construction at the Chartiers Pump Station, Markle Pump Station, Melwood Pump Station, and Westberry Pump Station. The work under Contract No. 2024-01 also includes coordination between all Contracts. The work under Contract No. 2024-02 generally consists of Electrical Construction at the Chartiers Pump Station, Markle Pump Station, Melwood Pump Station, and Westberry Pump Station. The work under Contract No. 2024-03 generally consists of General Construction of a sanitary sewer extension on LaBelle Vue Road. Estimated Contract Value: Contract 2024-01: General/Mechanical $1,338,000; Contract 2024-02: Electrical $960,000; Contract 2024-03 LaBelle Vue Road Sewer Extension $238,000 1) 2024-01: General/Mechanical - Greenland Const., Inc - 1157000 2) 2024-02: Electrical - Lanco Electric, Inc - 986104 3) 2024-03 LaBelle Vue Road Sewer Extension - W.A. Petrakis Contracting, LLC - 178190

Award

Water / Sewer

$2,321,294.00

Public - City

Site Work

67

19

25

8

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Power Filters and Conditioners, Capacitors, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
62
Bidding Soon
875
All Active Projects
401
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

April 7, 2025

img_map_placeholder

To Be Determined, Leechburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sewage System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.