Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 3, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Sumiton, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Walker County Contract Time: 100 Working Days DBE Goal Percent: 5.00 for constructing the Planing, Resurfacing, Traffic Signal Upgrades (Backplate Installation), Weigh-In-Motion (WIM) Station, and Traffic Stripe on SR-5 from the Jefferson County Line to a point 0.250 mile west of the junction of Rocky Ridge Road northwest of Sumiton. Length 4.033 mi The Bracket Estimate on this project is from $6,457,148 to $7,892,070. If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 032 - Planing, Resurfacing, Traffic Signal Upgrades (Backplate Installation), Weigh-In-Motion (WIM) Station, and Traffic Stripe on SR-5 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$6,196,065.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 10 - Specialties
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2025
April 1, 2025
AL-5, Sumiton, AL
Related To This Project
Sumiton, AL
--
Sumiton, AL
Bid Date: Feb 01 2024
Sumiton, AL
Bid Date: Jan 11 2022
Sumiton, AL
Bid Date: Sep 26 2023
Sumiton, AL
Bid Date: Jan 30 2025
Sumiton, AL
Bid Date: Aug 11 2022
Sumiton, AL
Bid Date: Aug 04 2022
Sumiton, AL
--
Sumiton, AL
Bid Date: Nov 28 2022
Sumiton, AL
Bid Date: Dec 08 2022
Sumiton, AL
Bid Date: Dec 06 2022
Sumiton, AL
Bid Date: Oct 06 2022
Sumiton, AL
Bid Date: Nov 10 2022
Bayou La Batre, AL
Bid Date: Jan 31 2025
Greenville, AL
Bid Date: Jan 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Planing, Resurfacing, Traffic Signal Upgrades (Backplate Installation), Weigh-In-Motion (WIM) Station, and Traffic Stripe on SR-5
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.