EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2025 at 7:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Hanover, Pennsylvania. Contact the soliciting agency for additional information.

2025 Traffic Line Painting the Contract Shall Cover the Period From April 1, 2025 to March 31, 2026 Sealed Bids Will Be Solicited Jointly by the Public Bodies Listed Above for Traffic Line Painting Including Approximately One Hundred Thirty (130) Miles of Four (4"") Inch Wide Double Yellow Line Markings and One Hundred Nineteen (119) Miles of Four (4"") Inch Wide Single White Line, Solid or Dashed, With Yellow and White Traffic Zone Paint to Meet or Exceed Pennsylvania Department of Transportation Publication 408 (1994 as Amended) and Publication Chapter 67, Title 21 1-k, Standards. Each Municipality Intends to Award at Their Next Publicly Advertised Council or Township Meeting Following the Bid Opening. A Bid Guarantee of Ten (10%) Percent of the Bid Price Must Accompany Each Bid, in the Form Of a Cashiers Check, Certified Check, Bid Bond or Cash Payable to the Borough of Hanover. The Public Bodies Reserve the Right to Reject Any or All Bids, or to Award the Contract as They Deem to Be in the Best Interests of the Municipal Bodies. The Township of Heidelberg and the Township of Manheim, all of York County, Pennsylvania; and The Borough of McSherrystown, The Township of Conewago, The Township of Union, The Township of Germany, and the Township of Oxford, all of Adams County, Pennsylvania, for the items below. Question Deadline 02/26/2025 at 4:00 PM ET Deadline for Submissions Online Portal The requirements of gasoline, motor oil, fuel oil, diesel oil, automatic transmission fluid, and multi-purpose grease for one year as listed on the bidding documents. Crushed stone of various sizes to meet Pennsylvania Department of Transportation specifications as listed on the bidding documents. Pre-mixed bituminous stockpile patching material; superpave; bituminous concrete base course (BCBC); and superpave mixture; all in accordance with Pennsylvania Department of Transportation specifications as listed on the bidding documents. Bulk rock salt and calcium chloride in fifty pound bags as listed on the bidding documents. Liquid chlorine in one hundred fifty pound cylinders, liquid chlorine in one ton containers, liquid ferrous sulphate, hydrofluosilicic acid, liquid alum in 4,000 gallon loads, sulphur dioxide, liquid polyaluminum chloride, sodium permanganate (40%), caustic soda and sodium hypochlorite (12%) and Earthtec(R) Liquid Copper Sulfate Pentahydrate as listed on the bidding documents. Road line painting, double yellow 4-inch wide lines, and white 4-inch wide lines, as listed on bidding documents. Waterborne traffic paint in yellow, white and blue five (5) gallon pails, as listed on bidding documents. Street milling services. The quantities for items one to eight are reflected on the bid form. Quantities specified are in the bid process for the sole purpose of obtaining a unit price. The public bodies shall not be penalized if actual use is more or less than quantities reflected on the bid sheets. The public bodies reserve the right to reject any or all bids.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
97
Bidding Soon
1,969
All Active Projects
913
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

April 1, 2025

img_map_placeholder

Multiple Locations, Hanover, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Traffic Line Painting

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.