Site work for a water / sewer project in Lykens, Pennsylvania. Completed plans call for site work for a water / sewer project.

Well No. 2 Water Main Extension Question Deadline 02/06/2025 at 4:00 PM ET Deadline to submit Questions Online Portal This project involves the site work related to installation of approximately 750 L.F. of owner-supplied 8" DICL pipe and 460 L.F. of contractor-supplied 20" of C-900 pipe and related work. All bids must include assurances that the following provisions will be complied with: Federal Labor Standards Provisions, US Department of Labor, 29 CFR 5; Section 3 of the Housing and Urban Development Act of 1974, as amended; 12 U.S.C. 1701U, which requires that, to the greatest extent feasible, opportunities for training and employment be given lower-income residents of the project area and contracts for work in substantial part by persons residing in the area of the project; Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin or sex, be excluded from participation in, be denied the benefits of or be subjected to discrimination; Certification of Non-Segregated Facilities, which assures the bidder does not maintain or provide any segregated facilities; Equal Opportunity provisions - Executive Order 11246, as amended, which assures non-discrimination; Minority Business Enterprise and Women Business Enterprise provisions, which encourage minority-owned businesses and women-owned businesses to bid on the project; Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located; Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid; The bidders must submit documentary evidence of Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted concurrently with the bid. Attention is called to the fact that payment of Davis-Bacon wages will be required on this project and the required wages have been included in the documents. Except as permitted by law, the Owner shall Award the Contract to the Lowest Responsible Bidder or reject all Bids within sixty (60) days from the date of Bid opening; and no bidder may withdraw his Bid before the expiration of such 60-day period; provided however that if the Award is delayed by the required approval of another Government agency, the sale of bonds, the award of a grant or grants, the Owner shall reject all Bids or Award the Contract to the Lowest Responsible Bidder within one hundred twenty (120) days from the date of Bid opening, and no bidder may withdraw his Bid prior to the expiration of such 120-day period. Thirty (30) day extensions of the date for the Award may be made by the mutual written consent of the owner and the Lowest Responsible Bidder. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. Bidders must comply with all State antibid-rigging and anti-kickback regulations pertaining to work associated with this project and will be required to submit an executed Non-Collusion Affidavit with the Bid. The Owner reserves the right to reject any or all bids, or portion thereof, and to waive any informalities and to accept any bid that it may deem to be in the best interest of the Authority.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

7

24

13

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
97
Bidding Soon
1,243
All Active Projects
571
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 31, 2025

img_map_placeholder

Multiple Locations, Lykens, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Well No. 2 Water Main Extension

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.