BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a mixed-use development in Syracuse, Utah. Working plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Site Address: 3550 South 2000 West Site Directions: Address listed above will take you to the adjacent school property. The project site is to the west up to 2400 West. Base Bid: Construction of 1 baseball field (with artificial turf infield), soccer fields, score tower, restroom facility, picnic pavilions, parking lot, roadway, roundabout, and surrounding sidewalks/fencing for the site. Additive Alternative 1: EnkaSport material (base bid) to be replaced by EnkaFlex within the artificial turf baseball infield area. Additive Alternative 2: Installation of a natural turf underdrain system as shown in the plans and specifications including but not limited to installation of geotextile fabric, pea gravel drainage layer, Enka Drain flat pipe, and 8" perforated collector pipe. Additive Alternative 3: Installation of a fertigation system installed downstream of the booster pump as a separate system designed to handle the phase 1 improvements only. Substantial Completion: June 19, 2026 No Award. Est. Completion Date: Oct. 1, 2026 Any inquiries or questions about this posting may be directed to Stephen Marshall at smarshall@syracuseut.gov until Wednesday, February 19, 2025, at 10:00 AM Additive Alternative 1: EnkaSport material (base bid) to be replaced by EnkaFlex within the artificial turf baseball infield area. Additive Alternative 2: Installation of a natural turf underdrain system as shown in the plans and specifications including but not limited to installation of geotextile fabric, pea gravel drainage layer, and Enka Drain flat pipe. The 8" perforated collector pipe shown as part of the underdrain system will be installed in the base bid as a French drain. Additive Alternative 3: Installation of a fertigation system installed downstream of the booster pump as a separate system designed to handle the phase 1 improvements only. Additive Alternative 4: Installation of Cooper Lighting Solutions ABB Arbor Bollards along the northern sidewalk. Includes all extra control panel breakers, wiring, controllers/timers, conduit, concrete bases and any other costs associated with installation of the light fixtures.

Final Planning

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Paving, Site Work

105

20

26

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
98
Bidding Soon
1,020
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

3550 S 2000 W, Syracuse, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.