BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Renovation of a library in Madison, Wisconsin. Completed plans call for the renovation of a library.

In general, the work consists of replacing the halon clean agent system in Memorial Library with a new pre-action sprinkler system. The obsolete halon system serving the Special Collections Library will be replaced with zoned preaction systems released with aspirating smoke detection. Ceilings will be removed and restored to allow for demolition and installation of the fire suppression systems. New lighting will be provided where ceilings are replaced. The isolation valve on the combination riser/standpipe will be replaced and a 3 drain riser installed. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. MBE (9%), WBE (9%)

Bid Results

Library

$3,090,000.00

Public - State/Provincial

Renovation

161

31

15

8

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
3
Bidding Soon
1,522
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

August 1, 2025

Project location map

728 State St, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.