Site work for a water / sewer project in Bettendorf, Iowa. Completed plans call for site work for a water / sewer project.

This program includes general and heavy cleaning, root and debris removal, and CIPP pipelining of approximately 14,407 linear feet of various sizes of pipe, at various locations within the City of Bettendorf, Iowa. All work on this contract shall be completed by April 30th, 2025. The beginning and completion dates will be included in and made part of the contract between the successful bidder and the City. Liquidated damages in the amount of Five Hundred Dollars and no/100 ($500.00) per calendar day shall be charged for every day past the completion date. Doc Note - Copies of the proposed Contract Documents for said improvements may be obtained with a forty eight (48) hour notice at the Engineering Division of Public Works, 4403 Devils Glen Rd., Bettendorf, Iowa by calling (563) 344-4055. Paper sets require a refundable deposit of Two Hundred Fifty Dollars ($250.00) for each set that shall be refunded within fourteen (14) days after the award of the project. If the Contract Documents are not returned in a timely manner and in a reusable condition, the deposit, or portions thereof, may be forfeited. Each proposal must be accompanied by a certified or cashier's check drawn on an Iowa bank or a bank chartered under the laws of the United States or by a Bid Bond with corporate surety satisfactory to the City of Bettendorf in the amount of ten (10) percent of the bid, made payable to the City Treasurer of the City of Bettendorf, Iowa, and may be cashed or claim made against the bond by the Treasurer of the City of Bettendorf, Iowa, as liquidated damages in the event the successful bidder fails to enter into a contract within ten (10) days and post bond satisfactory to the City for the faithful performance of the work. Checks or Bid Bonds of the three lowest bidders may be retained for a period of not to exceed thirty (30) days or until a contract is awarded or rejection is made, whichever is sooner. Other checks and Bid Bonds will be returned after the tabulation of the bids is completed. The successful bidder will be required to furnish a performance and maintenance bond equal to One Hundred Percent (100%) of the contract price. Said bond is to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and shall also guarantee the maintenance of the improvement for a period of four (4) years from and after its completion and acceptance by the City. The City reserves the right to reject any or all proposals and to waive technicalities and irregularities if deemed necessary and approved by City Council. This supplemental specification includes all labor, materials and equipment necessary for the preparation of the sod bed, furnishing and installing sod, watering, and maintenance for completed sodded areas as specified in the contract documents. The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to perform and complete in a workmanlike manner all the work required in connection with the construction of the 24/25 Sanitary Sewer Rehabilitation Project, all in strict accordance with the plans and specifications, including any and all addenda prepared by the Engineering Division of the Public Works Department of the City of Bettendorf, Iowa, which plans and specifications are made a part of this contract; and in strict compliance with the Contractor's proposal and the other contract documents herein mentioned which are a part of this contract. The Contractor shall do everything required by this contract and the other documents constituting a part thereof. The 2024 Sanitary Sewer Rehabilitation includes televising and evaluation, general and heavy cleaning, cutting protruding taps, and pipe lining.

Award

Water / Sewer

$566,770.00

Public - City

Site Work

49

7

4

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

Project location map

Multiple Locations, Bettendorf, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.