Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Site work and paving for a mixed-use development in Perris, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Scope of Work: Under these Specifications the Contractor shall perform all construction work located along 4th Street, Wilkerson Avenue, and Redlands Avenue in accordance with these specifications and the contract drawings. The work comprises of utilizing owner furnished materials (List of materials shown in Bidding Sheets BS-1) to construct approximately 282LF of 8-inch diameter gravity sewer line and 467LF of 10-inch diameter gravity sewer line located in 4th Street with 6 standard manholes, connections to existing sewer mains, approximately 47LF of 8-inch diameter gravity sewer line located at the intersection of Wilkerson Avenue and 4th Street with connections to existing sewer mains, approximately 27LF of 8-inch diameter gravity sewer line located at the intersection of Redlands Avenue and 4th Street with connections to existing sewer mains, and the decommissioning and demolition of an existing in-manhole lift station including pumps, valve vault, above ground improvements, wet well, force main, electrical and instrumentation. All related work includes night work throughout the duration of the Project; coordination regarding pipeline connections and field start-up and testing; implementation of required BMPs during construction; implementation of traffic control during construction per City of Perris encroachment permit requirements and approved traffic control plans; pavement restoration; bypass pumping system for connecting to existing manholes; coordinate system shutdown of the existing lift station to decommission. The shutdown of the lift station shall occur after the successful installation and approval of the proposed sewer gravity mains. Q&A Deadline 01/17/2025 5:00 PM (PST) Bid Bond 10.00% Project Duration 180 Days Estimated Bid Value $1 - $1.5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$1,036,380.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
April 7, 2025
Multiple Locations, Perris, CA
Related To This Project
Perris, CA
Bid Date: Feb 20 2025
Perris, CA
Bid Date: Jan 27 2025
Perris, CA
Bid Date: Jan 16 2025
Perris, CA
--
Perris, CA
Bid Date: Feb 20 2025
Perris, CA
Bid Date: Jan 28 2025
Perris, CA
--
Perris, CA
Bid Date: Feb 19 2025
Perris, CA
Bid Date: Jan 06 2025
Perris, CA
Bid Date: Dec 09 2020
Perris, CA
--
Perris, CA
Bid Date: Jan 14 2025
Perris, CA
Bid Date: Jan 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
