Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work and paving for a civil project in Hot Sulphur Springs, Colorado. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
Region: 3 Counties: Grand Contract UDBE Goal: 9.00 % Guaranty: 5% of Total Bid Fixed Completion Date: 10/28/2025 Safety improvement project located on US 40 from MM 215.90 extending to MM 219.88. Resurfacing will consist of a 2" overlay, full roadway and shoulder width along with full depth reclamation (shoulder), shoulder widening, striping and signing. Remove and replace Type 3 guardrail and end sections. New Type 9 barrier. Drainage slope repair. Extend existing culverts and add inlets. This project is located in Region 3 in Grand County. Project work consists of safety improvements on US 40. Please contact Grant Anderson by phone at 720-505-1793 or by email grant.anderson@state.co.us for all project related questions. It is estimated that the total cost of all items in the bid will be: (X) Between $5,000,000 and $20,000,000 Bids will be accepted only from pre-qualified bidders who attend the mandatory pre-bid conference. CO DOT: 003 - Region 3 - Region 3 - US 40 Safety Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall organize the work such that there will be no hazards within the Clear Zone at the completion of each day's work. Employee vehicle parking is prohibited where it conflicts with safety, access, or flow of traffic. No employee parking will be allowed within the clear zone. The Contractor and the Engineer, prior to starting work, shall locate parking areas to be approved by the Engineer. Any signs damaged due to the Contractor's operations shall be replaced in-kind or repaired by the Contractor at no expense to the project. Sufficient Traffic Control Devices are included in the plans to cover expected construction activities. Should the Contractor elect to utilize additional devices to enhance the operation, the additional devices will not be paid for but shall be provided at the Contractor's expense, unless otherwise approved for payment by the Engineer. At least one week prior to starting construction, the Contractor shall notify the Town of Granby Public Works, and Grand County Engineer (depending on location of work) of the date the Contractor intends to start construction. Questions received from bidders along with CDOT responses will be posted on the CDOT web site listed below as they become available. http://www.coloradodot.info/business/bidding/future-bidding-opportunities Question Deadline 02/03/2025 at 7:00 AM MT All questions shall be directed to the CDOT contacts listed above no later than 7:00 A.M. Monday of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week. Questions and answers shall be used for reference only and shall not be considered part of the Contract.
Award
Roads / Highways
$5,792,197.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
April 7, 2025
U.S. Hwy 40, Hot Sulphur Springs, CO
Related To This Project
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Jan 21 2025
Hot Sulphur Springs, CO
Bid Date: Dec 12 2024
Hot Sulphur Springs, CO
Bid Date: Nov 04 2024
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Sep 12 2024
Hot Sulphur Springs, CO
Bid Date: Aug 16 2024
Hot Sulphur Springs, CO
Bid Date: May 08 2024
Hot Sulphur Springs, CO
Bid Date: Mar 27 2024
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Mar 07 2024
Hot Sulphur Springs, CO
Bid Date: Oct 18 2023
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.