Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 12, 2025
Site work for a water / sewer project in Circle, Montana. Completed plans call for site work for a water / sewer project.
The project consists of constructing a two-cell total retention lagoon system which includes a 6.34 acre evaporation pond and a 4.03 acre evaporation pond. Approximately 550 feet of 6" HDPE forcemain will also be installed as part o this project. All laborers and mechanics employed by Contractor or Subcontractors in performance of the construction work shall be paid wages at rates as required by Davis Bacon Wage Act or State Prevailing Wages, whichever is higher. The Contractor must ensure that employees and applicants for employment aro not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to Town of Circle, in an amount not less than ten percent (10%) of the total amount of the bid. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful Bidder(s) and a certificate(s) of that insurance shall be provided. This project is funded in part or in whole with grant/loan funding from the State Revolving Fund (SRF). Award of the project will be contingent upon receiving funding and award concurrence from Montana DNRC/SRF. Bids may only be withdrawn as provided in Section 16.02 of the Instructions to Bidders after the scheduled time for the public opening of bids. Question Deadline 01/31/2025 at 5:00 PM MT All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering. Written comments may be submitted to Greg Lukasik of Great West Engineering by mail at: 6780 Trade Center Avenue, Billings, MT 59101 or email at: glukasik@greatwesteng.com The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid that is in the best interest of the Owner. Doc Notes: Digital copies of the Bidding Documents are available at online for a fee of $35. These documents may be downloaded by selecting this project from the "Current Projects Bidding" tab. Project bid documents must be downloaded from online which will add your company to the and allow access to vBid online bidding for the submittal of your bid.
Award
Water / Sewer
$2,275,896.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
April 7, 2025
To Be Determined, Circle, MT
Related To This Project
Circle, MT
Bid Date: Mar 20 2025
Circle, MT
--
Circle, MT
Bid Date: Jan 09 2025
Circle, MT
Bid Date: Jun 06 2024
Circle, MT
Bid Date: Mar 28 2024
Circle, MT
Bid Date: Mar 11 2024
Circle, MT
Bid Date: Feb 14 2019
Circle, MT
Bid Date: Aug 14 2023
Circle, MT
Bid Date: Jun 20 2022
Circle, MT
Bid Date: Sep 08 2022
Circle, MT
Bid Date: Oct 27 2022
Circle, MT
Bid Date: Feb 01 2023
Billings, MT
Bid Date: Jan 29 2025
Pompeys Pillar, MT
Bid Date: Mar 10 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
