EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a conference / convention center in Charlton, Massachusetts. Completed plans call for the renovation of a conference / convention center.

Request for Quotes Security Service Window Installation 37 Main St. Charlton, MA 01507 Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. If you have any questions regarding the bid requirements or timeline, please contact Town Administrator Andrew Golas at: 508-248-2206, email andrew.golas@townofcharlton.net. SCOPE OF WORK Treasurer/Collector's office: o Lower existing window to meet ADA accessibility requirements, move existing cabinet/countertop over to accommodate the new height requirements for the lowered window. (window width to remain the same size) o Replace existing glass to accommodate the new opening dimensions, glass to be clear safety laminated type. o Install 24" wide black granite countertop to match existing countertops already in place in the Conservation and Building Department offices. (length of countertop to accommodate window opening size) o Replace and match all existing trim work on both sides of window. o Paint all areas to match existing color schemes. Assessor's office: o Lower existing window to meet ADA accessibility requirements, lower and move existing shelf/countertop over to accommodate the new height requirements for the lowered window (window width to remain the same size) o Replace existing glass to accommodate the new opening dimensions, glass to be clear safety laminated type. o Install 30" wide black granite countertop to match existing countertops already in place in the Conservation and Building Department offices. (length of countertop to accommodate window opening size) o Replace and match all existing trim work on both sides of window. o Paint all areas to match existing color schemes. Selectmen's office: o Frame in and install 60" W X 42"H security window (window height off floor to be ADA compliant) o Glass type to be clear safety laminated type. o Install 24" wide black granite countertop to match existing countertops already in place in the Conservation and Building Department offices. (length of countertop to accommodate window opening size) o Replace and match all existing trim work on both sides of window. o Paint, stain and polyurethane all affected areas to match existing color schemes. Town Clerk's office: o Frame in and install 60" W X 42"H security window (window height off floor to be ADA compliant) o Glass type to be clear safety laminated type. o Install 24" wide black granite countertop to match existing countertops already in place in the Conservation and Building Department offices. (length of countertop to accommodate window opening size) o Replace and match all existing trim work on both sides of window. o Paint, stain and polyurethane all affected areas to match existing color schemes. ADDITIONAL REQUIREMENTS: o Visual removal of all debris shall be a minimum of daily. All debris will be disposed of properly. o Price is to include cleanup and removal of all job-related debris o Response must include cost proposal, certifications, and required forms. o All work must commence and be completed within the time period agreed upon by the two parties. The anticipated date of award of the contract is February 6, 2025.

Bid Results

Conference / Convention Centers

$23,100.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
240
Bidding Soon
3,513
All Active Projects
1,671
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 1, 2025

img_map_placeholder

37 Main St, Charlton, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Security Service Window Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.