Site work for a water / sewer project in Bonavista, Newfoundland. Completed plans call for site work for a water / sewer project.
Closing Time: 12:00 PM (NT) Storm Damage Repairs at Various Locations on the Bonavista Peninsula Part A: Storm Damage Repairs R230-17, km 1.0 to km 1.2, Champney’s West Part B: Storm Damage Repairs R230-21, km 3.0 to km 3.2, English Harbour Part C: Storm Damage Repairs R230-21, km 4.0, English Harbour The Work will be substantially performed within 1.0 months from the date of notification of award of contract or 20 February 2025, whichever is later. Contractors are advised the PROJECT shall include, but will not be limited to, the scope as outlined in the following summary. Part "A": Storm Damage Repairs R230-17, km 1.0 to km 1.2. Champney's West Mobilize to site. Establish traffic control as required at site, Remove damaged guide rail, Minor excavation and removal of excess beach material, Placement of class III hydraulic rip rap to bulk and/or replace existing armour stone along the shoreline, Placement of rock fill to re-establish road shoulders, Replace guide rail and buried end, Place granular A shouldering along both sides of the roadway, General site clean up and demobilize. The cross section at this location shall be similar to an RLU 60 except that the asphalt and shoulder widths shall match existing conditions. Part "B": Storm Damage Repairs R230-21, km 3.0 to km 3.2. English Harbour Mobilize to site. Establish traffic control as required at site, Excavation and removal of excess beach material to provide trench for armour stone placement, Salvage existing armour stones and hydraulic rip rap rock for re-use, Placement of salvaged and new armour stone and hydraulic class III rip rap along the shoreline, Placement of rock fill to re-establish road shoulders. Place granular A shouldering along shoreline side of the roadway, General site clean up and demobilize. Part "C": Storm Damage Repairs R230-21, km 4.0, English Harbour Mobilize to site, Establish traffic control as required at site, Placement of armour stone and class III hydraulic rip rap to bulk and/or replace existing armour stone protecting the existing box culvert outlet, General site clean up and demobilize. For further information, please refer to the breakdown of quantities in the tender document and the updated Department's Specifications Book. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Water / Sewer
$145,650.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.